DG Cheat Sheet 2026

The 30 highest-yield DG facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.

  1. What must be done when Centre of Gravity Determination legislation changes? Update procedures, risk assessments, and training to comply with the new requirements
  2. How should Load Assessment and Weight Estimation incidents be reported in an Australian workplace? Report immediately to the supervisor, with notifiable incidents reported to the regulator
  3. What type of barrier is most appropriate for establishing a temporary exclusion zone during a lifting operation on a construction site? Bunting, witches' hats, or barrier tape with signage
  4. What training is required before workers perform Sling Types and Selection activities? Appropriate training covering hazards, procedures, equipment use, and emergency response
  5. How often should Centre of Gravity Determination procedures be reviewed? Regularly, after incidents, when conditions change, or when new information emerges
  6. What training is required before workers perform Rigging Hardware Inspection activities? Appropriate training covering hazards, procedures, equipment use, and emergency response
  7. How should Load Charts Understanding incidents be reported in an Australian workplace? Report immediately to the supervisor, with notifiable incidents reported to the regulator
  8. What must be done when Lifting Plan Development legislation changes? Update procedures, risk assessments, and training to comply with the new requirements
  9. How often should Shackles and Fittings procedures be reviewed? Regularly, after incidents, when conditions change, or when new information emerges
  10. In Australian Australian dogging and lifting operations, what is the primary purpose of Load Charts Understanding procedures? To protect worker health and safety through systematic hazard management
  11. What is the importance of near-miss reporting for Crane Signals and Communication? Near misses reveal existing hazards and allow preventive action before injuries occur
  12. What must be done when Load Assessment and Weight Estimation legislation changes? Update procedures, risk assessments, and training to comply with the new requirements
  13. What supervisory requirements exist for Shackles and Fittings activities? Adequate supervision by competent persons, proportionate to the level of risk
  14. In Australian Australian dogging and lifting operations, what is the primary purpose of Crane Signals and Communication procedures? To protect worker health and safety through systematic hazard management
  15. What does the term 'fall zone' mean in the context of exclusion zones for lifting operations? The area that could be struck by a falling load or failed lifting component
  16. What must be done when Load Charts Understanding legislation changes? Update procedures, risk assessments, and training to comply with the new requirements
  17. How should Emergency Procedures incidents be reported in an Australian workplace? Report immediately to the supervisor, with notifiable incidents reported to the regulator
  18. What is the importance of near-miss reporting for Sling Types and Selection? Near misses reveal existing hazards and allow preventive action before injuries occur
  19. What must be done when Rigging Hardware Inspection legislation changes? Update procedures, risk assessments, and training to comply with the new requirements
  20. Under Australian regulations, who bears primary responsibility for Lifting Plan Development compliance? The PCBU (Person Conducting a Business or Undertaking)
  21. In Australian Australian dogging and lifting operations, what is the primary purpose of Sling Types and Selection procedures? To protect worker health and safety through systematic hazard management
  22. How should Rigging Hardware Inspection incidents be reported in an Australian workplace? Report immediately to the supervisor, with notifiable incidents reported to the regulator
  23. Under Australian regulations, who bears primary responsibility for Emergency Procedures compliance? The PCBU (Person Conducting a Business or Undertaking)
  24. How often should Rigging Hardware Inspection procedures be reviewed? Regularly, after incidents, when conditions change, or when new information emerges
  25. When determining the size of an exclusion zone, which factor is the MOST critical consideration? The potential swing radius and fall zone of the load
  26. What is the first step in a Shackles and Fittings risk assessment? Identify all hazards associated with ${subjectName}
  27. How often should Hazard Assessment for Lifting procedures be reviewed? Regularly, after incidents, when conditions change, or when new information emerges
  28. How should Hazard Assessment for Lifting incidents be reported in an Australian workplace? Report immediately to the supervisor, with notifiable incidents reported to the regulator
  29. What supervisory requirements exist for Load Assessment and Weight Estimation activities? Adequate supervision by competent persons, proportionate to the level of risk
  30. In Australian Australian dogging and lifting operations, what is the primary purpose of Tag Line Usage procedures? To protect worker health and safety through systematic hazard management