A fabricator has a WPS qualified for a groove weld on 1-inch thick carbon steel plate.
The WPS specifies a 1/8" E7018 electrode.
An engineer wants to use a 5/32" E7018 electrode for increased deposition rate, which is a change in an essential variable according to ASME IX.
What must be done before this change can be implemented in production?