← All CVM Flashcard Decks

CVM Computer System Validation & Software Testing Flashcards

6 cards from real CVM practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 CVM Computer System Validation & Software Testing flashcards as text
  1. What is the FDA's concept of 'predicate rule' in relation to 21 CFR Part 11?

    Answer: The underlying regulation (e.g., 21 CFR Part 211) that requires the record to exist — Part 11 governs how it may be maintained electronically

    The predicate rule is the underlying GMP/GLP/GCP regulation requiring a specific record; 21 CFR Part 11 applies when that record is maintained electronically.

  2. In CSV, 'system retirement' or 'decommissioning' requires which of the following to protect data integrity?

    Answer: A documented plan for data migration or archival to ensure records remain accessible throughout the retention period

    When retiring a validated system, a decommissioning plan must ensure all GxP records are migrated or archived in a retrievable format for their required retention periods.

  3. What does 'data integrity' mean in the context of GxP computerized systems, summarized by the ALCOA+ acronym?

    Answer: Data that is Attributable, Legible, Contemporaneous, Original, and Accurate (plus Complete, Consistent, Enduring, Available)

    ALCOA+ defines the attributes that GxP data must meet: Attributable, Legible, Contemporaneous, Original, Accurate, plus Complete, Consistent, Enduring, and Available.

  4. Which testing approach in CSV involves testing the system without knowledge of the internal code or architecture, focusing on inputs and expected outputs?

    Answer: Black-box testing

    Black-box testing evaluates system behavior based on inputs and expected outputs without examining internal code, simulating the end-user perspective used in OQ and PQ.

  5. What is the key deliverable produced at the end of a Computer System Validation project that summarizes all validation activities and conclusions?

    Answer: Validation Summary Report

    The Validation Summary Report compiles all validation activities, test results, deviations, and conclusions to formally declare the system validated and suitable for its intended use.

  6. When a software update (patch or upgrade) is applied to a validated GxP system, which action is always required?

    Answer: A documented change control assessment and appropriate regression testing proportional to the scope of the change

    Software updates must go through change control with a risk-based impact assessment and targeted regression testing to confirm the validated state is maintained after the update.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. gmp-compliance.org — Test delivery, renewal, score release, score validity, eligibility · verified Oct 2026