Process Improvement & Optimization Flashcards
7 cards from real CTP practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Process Improvement & Optimization flashcards as text
In FMEA, the Risk Priority Number (RPN) is calculated by multiplying which three factors?
Answer: Severity, occurrence, and detection
RPN equals Severity × Occurrence × Detection, each typically rated 1-10.
A control chart shows seven consecutive points above the centerline but within control limits. What should the analyst conclude?
Answer: A non-random shift may be occurring and should be investigated
A run of consecutive points on one side of the centerline signals a likely special cause.
Which Lean tool uses visual signals to authorize production or replenishment only when needed?
Answer: Kanban
Kanban cards or signals trigger pull-based replenishment to limit overproduction.
An operator designs a fixture that only allows a part to be inserted in the correct orientation. This is an example of:
Answer: Poka-yoke
Poka-yoke is mistake-proofing that prevents errors from occurring.
What is the main difference between common cause and special cause variation?
Answer: Common cause is inherent to the process; special cause comes from assignable, unusual sources
Common cause variation is natural noise, while special cause variation stems from identifiable events.
SMED (Single-Minute Exchange of Die) primarily aims to reduce which of the following?
Answer: Setup and changeover time
SMED converts internal setup steps to external ones to shorten changeovers.
In a value stream map, which metric compares value-added time to total lead time?
Answer: Process cycle efficiency
Process cycle efficiency equals value-added time divided by total lead time.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. We have not yet matched this exam's facts to an official source, so confirm fees, dates and rules with the exam body. Editorial policy