CTI Substrate Preparation & Waterproofing Flashcards
6 cards from real CTI practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 CTI Substrate Preparation & Waterproofing flashcards as text
What is the minimum thickness of a Portland cement mortar bed for a floor tile installation per TCNA standards?
Answer: 3/4 inch
TCNA specifies a minimum mortar bed thickness of 3/4 inch for floor installations to provide adequate structural support.
Which ASTM standard governs the in-situ relative humidity probe test for concrete slab moisture?
Answer: ASTM F2170
ASTM F2170 covers the in-situ relative humidity probe test, where probes are inserted into drilled holes in the slab.
How should a CTI inspector recommend correcting a substrate with excessive high spots and low spots before tiling?
Answer: Grind high spots and fill low spots with patching compound
Both high spots must be ground down and low spots filled to achieve a flat substrate meeting the required tolerance.
What is the maximum substrate flatness tolerance for large-format tiles with any side 15 inches or longer?
Answer: 1/8 inch in 10 feet
TCNA recommends no more than 1/8 inch variation in 10 feet for large-format tiles to prevent visible lippage.
What material is typically used to bond a secondary waterproofing membrane to a substrate around shower niches and corners?
Answer: Thinset mortar per the membrane manufacturer's specifications
The membrane manufacturer specifies the bonding material — typically unmodified or modified thinset — to ensure compatibility and maintain warranty coverage.
Most crack isolation membranes are rated to accommodate existing substrate cracks up to what maximum width?
Answer: 1/8 inch
Most crack isolation membranes accommodate cracks up to 1/8 inch wide without transferring movement stress to the tile surface.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- ceramictilefoundation.org — Eligibility, fees, registration, test delivery, exam format, late registration, passing score, retake policy, score release, time limit · verified Oct 2026