CST Cheat Sheet 2026
The 30 highest-yield CST facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.
100 questions
180 min time limit
70.00% to pass
- When a project schedule shows a Scheduled Performance Index (SPI) of 0.85, this means the project is: → Behind schedule, accomplishing only 85 cents of work for every dollar planned
- Which document formally authorizes a project and provides the project manager with authority to apply organizational resources? → Project charter
- A resource histogram shows a technician allocated at 140% for two consecutive weeks. What does this represent? → Resource over-allocation requiring resolution
- What does a Work Breakdown Structure (WBS) help with? → Breaking down project tasks into smaller components
- Which MS Project view best displays resource allocation across all tasks to identify overallocations? → Resource Usage view
- What is the purpose of a 'resource calendar' in a resource-loaded schedule? → To define when each resource is available, including vacations and holidays
- Why are cloud-based scheduling tools advantageous? → They provide real-time collaboration and accessibility
- Which scheduling technique uses probabilistic time estimates (optimistic, most likely, pessimistic) to calculate expected activity durations? → PERT
- The technique of shortening the project schedule by overlapping activities that would normally be performed sequentially is called: → Fast-tracking
- A Finish-to-Start relationship with a lag of 3 days means: → Activity B cannot start until 3 days after Activity A finishes
- A project manager needs to compress the schedule by overlapping activities that were originally planned sequentially. This technique is called: → Fast tracking
- When applying fast-tracking, which type of dependency is most commonly modified? → Discretionary finish-to-start dependencies
- In schedule risk analysis, what does a 'three-point estimate' consist of? → Optimistic, most likely, and pessimistic duration estimates for an activity
- What is the relationship between the Authorized Work (AW) and the Performance Measurement Baseline (PMB) in a government EVM system? → AW equals PMB plus management reserve
- Which quality assurance method is most commonly applied in cost-loaded schedule integration to verify that CST professional standards are being met? → Structured audits, peer reviews, and performance metrics aligned with industry benchmarks
- What scheduling document is commonly required by public agency contracts to substantiate a contractor's request for a time extension? → A contemporaneous schedule delay analysis using the accepted project schedule
- What is the primary ethical obligation of a CST professional when a conflict of interest arises during resource loading & leveling activities? → Disclose the conflict to all relevant parties and recuse from the decision if necessary
- Which of the following is a fundamental principle of cost-loaded schedule integration as it applies to Certified Scheduling Technician? → Systematic evaluation and adherence to established industry standards
- What is the Estimate at Completion (EAC) formula when the original estimate is no longer valid and future work is expected to proceed at the current CPI? → EAC = BAC / CPI
- In schedule compression, 'what-if' scenario analysis is primarily used to: → Evaluate the impact of potential schedule changes before implementing them
- Which lag type applied to a milestone predecessor relationship would delay a milestone by 2 weeks after its predecessor finishes? → Positive lag of 2 weeks on a Finish-to-Start link
- When converting an Arrow Diagramming Method (ADM) network to a Precedence Diagramming Method (PDM) network, dummy activities are: → Eliminated because PDM uses node-based logic to capture dependencies directly
- Which AACE International Recommended Practice is specifically associated with forensic schedule analysis and delay claim methodologies? → RP 29R-03
- A schedule network shows that Activity C can start as soon as Activity A is 50% complete. This is modeled as a: → Start-to-start relationship
- When two activities compete for the same resource, a scheduler creates a logical dependency between them. This type of added dependency is called a: → Resource-driven dependency
- When using the Program Evaluation and Review Technique (PERT), which formula calculates the expected duration of an activity? → (O + 4M + P) / 6
- Which of the following is a primary risk associated with fast-tracking? → Increased rework if errors in overlapped activities propagate downstream
- The 'But For' analysis in schedule delay disputes attempts to answer: → What would the schedule look like but for the alleged delay event?
- Which quality assurance method is most commonly applied in critical path & float analysis to verify that CST professional standards are being met? → Structured audits, peer reviews, and performance metrics aligned with industry benchmarks
- The Earned Schedule (ES) method improves upon traditional EVM schedule metrics by: → Converting SV from dollars to days, providing a time-based schedule variance