โ† All CSI Flashcard Decks

Project Delivery Methods Flashcards

6 cards from real CSI practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 6 Project Delivery Methods flashcards as text
  1. Which project delivery method involves a single contract for both design and construction?

    Answer: Design-build

    Design-build combines design and construction services under one contract, fostering collaboration and reducing conflicts.

  2. What is a primary advantage of the design-bid-build method?

    Answer: Clear separation of roles

    Design-bid-build provides clear separation between design and construction, which can simplify risk management.

  3. Which delivery method allows early involvement of the contractor during the design phase?

    Answer: Construction Manager at Risk

    Construction Manager at Risk (CMAR) involves the contractor early, which helps with constructability and cost estimates.

  4. What defines Integrated Project Delivery (IPD)?

    Answer: Collaborative, shared risk approach

    IPD uses a shared risk/reward model with early collaboration among owner, designer, and builder.

  5. In which method does the owner hold separate contracts with designer and contractor?

    Answer: Design-bid-build

    Design-bid-build keeps contracts separate, maintaining independence between design and construction.

  6. What is one potential drawback of the design-build method?

    Answer: Limited owner design input

    With design-build, the owner may have reduced control over design since it's handled by the same team managing construction.