CSI Cheat Sheet 2026

The 30 highest-yield CSI facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.

120 questions
120 min time limit
75.00% to pass
  1. What is the primary purpose of a payment bond in construction contracting? → To protect subcontractors and suppliers from non-payment by the contractor
  2. What does the term 'delegated design' mean in the context of construction specifications? → The contractor is responsible for engineering design of a portion of the work
  3. Which delivery method typically places the greatest construction cost risk on the contractor? → Lump-sum Design-Bid-Build
  4. When specifying quality assurance requirements, which item belongs in a specification section rather than on the drawings? → Installer qualification requirements and testing frequency
  5. What ethical consideration is most relevant to materials science & specifications in CSI practice? → Maintaining confidentiality and acting in the best interest of stakeholders
  6. In a specifications review, 'front-end documents' refers to: → Division 00 Procurement and Contracting Requirements and Division 01 General Requirements
  7. Which statement best describes the relationship between specifications and drawings in a construction contract? → Both are contract documents of equal legal weight that must be coordinated
  8. The AIA E201 Digital Data Protocol Exhibit is used to: → Define protocols for transmitting and using digital data among project participants
  9. Which of the following UniFormat groups covers both Special Construction and Selective Demolition? → F – Special Construction & Demolition
  10. In the context of CSI submittal procedures, what does 'action submittal' mean? → A submittal requiring a formal written response from the design professional
  11. In a construction manager at-risk (CMAR) delivery, the construction manager provides a guaranteed maximum price (GMP) at which stage? → After design development or construction documents are sufficiently complete
  12. Which document formally establishes the legal relationship between the owner and the contractor? → Agreement Form
  13. Which standard of practice is MOST important for ensuring quality in UniFormat & Elemental Classification? → Following evidence-based protocols while adapting to specific circumstances
  14. A Construction Change Directive (CCD) is most appropriately used when: → Immediate work is needed but agreement on cost or time has not been reached
  15. In MasterFormat, the Specifications group spans which divisions? → Divisions 01–49
  16. What is the significance of peer review in materials science & specifications for CSI professionals? → It promotes accountability, knowledge sharing, and quality improvement
  17. When implementing safety regulations & osha compliance practices, what should a CSI professional prioritize first? → Compliance with established standards and protocols
  18. Which imperative voice construction is preferred in CSI specification writing? → The contractor shall install
  19. Which CSI MasterFormat section number is typically used for Quality Requirements in Division 01? → 01 40 00
  20. When specifying green roofing systems for stormwater management, which CSI Division is most relevant? → Division 07 - Thermal and Moisture Protection
  21. In UniFormat, 'Exterior Windows' falls under which Level 2 group? → B20 – Exterior Enclosure
  22. Under the Federal Acquisition Regulation (FAR), what threshold generally requires full and open competitive bidding for federal construction contracts? → $150,000
  23. In a specification section, 'field quality control' requirements are typically placed in which Part? → Part 3 – Execution
  24. In a specification, the phrase 'submit for information only' (SFI) for a submittal means the architect will: → File the submittal without formal review or approval action
  25. Which document establishes the minimum qualifications a contractor must meet to be considered for award? → Bidder's Prequalification Criteria
  26. Which MasterFormat facility type subgroup covers Water and Wastewater infrastructure? → Divisions 44–46
  27. Which AIA document is specifically tailored for Sustainable Projects incorporating LEED or similar rating systems? → AIA E204
  28. In a multiple prime contracting arrangement, who coordinates the work of the separate prime contractors? → The owner or an owner's representative/construction manager
  29. How should a CSI professional handle a situation where project scheduling & resource management protocols conflict with practical constraints? → Document the conflict and seek guidance from appropriate authorities
  30. Which material is known for its high tensile strength and flexibility? → Steel