What is the correct hierarchy of control measures when managing risks on a construction site?
-
A
PPE, substitution, elimination, engineering controls
-
B
Elimination, substitution, engineering controls, administrative controls, PPE
-
C
Administrative controls, PPE, elimination, substitution
-
D
PPE, engineering controls, elimination, substitution, administrative controls