← All CSCS IRELAND Flashcard Decks

Working at Height Flashcards

6 cards from real CSCS IRELAND practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Working at Height flashcards as text
  1. What is a toe board on a scaffold, and what is its purpose?

    Answer: A board at the base of the platform edge that prevents tools and materials from being kicked off

    A toe board (typically at least 150 mm high) is fixed at the edge of a scaffold platform to prevent tools, materials, or debris from rolling or being kicked off, which could injure people below.

  2. Before using a ladder on a construction site, what inspection should be carried out?

    Answer: Check rungs, stiles, feet, and locking mechanisms for damage, wear, or contamination before each use

    Ladders must be visually inspected before each use. Check stiles for cracks or bending, rungs for damage or slipperiness, feet for wear or missing anti-slip pads, and locking mechanisms on combination ladders.

  3. What is the minimum overlap required when extending a scaffold to reach a higher level?

    Answer: Three board widths or as specified by the scaffold manufacturer

    Scaffold boards and extension ladders must overlap sufficiently to maintain structural integrity. For scaffold boards, at least three board widths of overlap is required, or as specified by the manufacturer's instructions.

  4. What personal protective equipment is essential when working at height if collective protection is insufficient?

    Answer: A full body harness with an appropriate lanyard or inertia reel connected to a secure anchor point

    When collective protection (guardrails, nets) cannot prevent a fall, a full body harness with a suitable energy-absorbing lanyard or inertia reel, attached to a certified anchor point, must be worn.

  5. What should a worker do if they discover a scaffold has been partially dismantled or is incomplete?

    Answer: Do not use it and report it to the supervisor immediately

    A partially dismantled or incomplete scaffold is extremely dangerous. No work should be carried out on it and the defect must be reported immediately so it can be properly inspected and repaired by a competent person.

  6. How often must scaffolding on a construction site in Ireland be formally inspected?

    Answer: At least every 7 days and after any event that may have affected its stability (e.g. severe weather)

    Under the Safety, Health and Welfare at Work (Construction) Regulations 2013, scaffolding must be inspected at least every 7 days and after any event (storm, impact) that could affect its integrity.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. solas.ie — Test delivery, eligibility, fees, renewal, score validity, exam information · verified Oct 2026