  1. What fire prevention measures are required on an Irish construction site?

    Answer: A fire risk assessment, appropriate fire extinguishers throughout the site, safe storage of flammable materials, hot work permits, clear escape routes, fire points, alarm systems, and trained fire wardens

    Fire prevention on construction sites requires: a site-specific fire risk assessment, appropriate fire extinguishers at fire points throughout the site, safe storage of flammable materials and gases (in ventilated, signed areas), a hot work permit system, clear and maintained escape routes, an alarm system (air horns minimum), fire wardens, and regular housekeeping to remove combustible waste.

  2. What is a hot work permit and when is it required on an Irish construction site?

    Answer: A written authorisation required before any work involving open flames, sparks, or heat sources (welding, cutting, grinding, brazing) near combustible materials — specifying precautions, fire watch, and duration

    A hot work permit is a formal written system authorising work that generates heat, sparks, or flames (welding, cutting, grinding, brazing, torch application). It specifies: the work area and duration, fire prevention measures, combustible materials removal, fire extinguisher provision, fire watch during and after work (typically 30-60 minutes), and the authorised person's signature.

  3. What should be done if a worker is electrocuted on a construction site?

    Answer: Do NOT touch the casualty until the power source is isolated — switch off at the mains/isolator, call 999/112, once safe begin CPR if the casualty is not breathing, and treat burns

    NEVER touch an electrocution casualty until the power is confirmed off — you will also be electrocuted. Steps: (1) isolate the power source (switch off, remove plug, use a non-conductive object to separate if low voltage), (2) call 999/112, (3) once safe, check breathing and begin CPR if needed, (4) treat visible burns, (5) place in recovery position if breathing. All electrical burns require hospital assessment.

  4. What is the procedure for dealing with a suspected gas leak on a construction site?

    Answer: Do not create any ignition source (no smoking, phones, switches, engines), evacuate the area upwind, call 999/112 and the gas emergency number, establish an exclusion zone, and do not re-enter until cleared by Gas Networks Ireland

    Gas leak response: (1) eliminate ALL ignition sources immediately (no smoking, phones, electrical switches, vehicle engines), (2) evacuate everyone upwind of the leak, (3) call 999/112 and Gas Networks Ireland emergency number (1800 20 50 50), (4) establish an exclusion zone, (5) do not attempt to repair the leak, (6) ventilate enclosed areas if safe, (7) do not re-enter until Gas Networks Ireland declares it safe.

  5. What information should be recorded and reported after a workplace accident on an Irish construction site?

    Answer: Details of the accident (time, location, circumstances, persons involved, injuries, witnesses), first aid given, and reportable accidents must be notified to the HSA using the prescribed form (IR1) within 10 working days

    All accidents must be recorded in the site accident book. Reportable accidents must be notified to the HSA: fatalities and certain specified injuries immediately by the quickest means, and a written report (IR1 form) within 10 working days. An accident is reportable if it results in death, specified injuries, or absence from work for more than 3 consecutive days (excluding the day of the accident).

  6. What is the role of an emergency coordinator on an Irish construction site?

    Answer: A designated person responsible for activating the emergency plan, coordinating the evacuation, liaising with emergency services, accounting for all personnel, and declaring the all-clear after the emergency

    The emergency coordinator (often the site manager or PSCS representative) is the designated person who takes charge during an emergency. Their responsibilities include: activating the emergency plan, directing the evacuation, coordinating with fire wardens and first aiders, calling emergency services, meeting and briefing arriving emergency services, accounting for all personnel at assembly points, and authorising the return to work.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. solas.ie — Test delivery, eligibility, fees, renewal, score validity, exam information · verified Oct 2026