A 'hot work' permit is required before starting a task involving grinding on a construction site. Which of the following is a critical control measure that MUST be in place for the duration of the work and for a set period afterwards?
-
A
Ensuring the grinder has a valid PAT test certificate.
-
B
A designated and competent fire watch.
-
C
Having a second worker available to assist with the task.
-
D
Cordoning off the area with warning tape.