  1. What does EER measure in the context of a geothermal heat pump operating in cooling mode?

    Answer: Ratio of cooling output (BTU/hr) to electrical input (watts) at a single rating condition

    EER (Energy Efficiency Ratio) is the instantaneous cooling capacity in BTU/hr divided by electrical power input in watts at a specific set of rating conditions.

  2. What is 'borehole thermal resistance' (Rb) and why does it matter in loop design?

    Answer: Thermal resistance between the circulating fluid and the borehole wall; higher Rb requires longer bores

    Borehole thermal resistance (Rb) quantifies how difficult it is for heat to move between the fluid in the U-tube and the surrounding ground; a higher Rb means less efficient heat exchange and greater required bore length.

  3. When a geothermal system is designed with a 'hybrid' configuration pairing a ground loop with a cooling tower, what problem does this solve?

    Answer: Cooling-dominated building loads that would thermally saturate the ground loop

    A cooling tower (or fluid cooler) rejects surplus heat to the atmosphere in cooling-dominated climates, preventing multi-year ground temperature rise that would degrade heat pump efficiency.

  4. IGSHPA's block-load design method for residential systems requires knowing the design-month peak block load and the annual equivalent full-load hours. What are the annual hours used to calculate?

    Answer: The annual ground heat exchange needed to determine long-term temperature penalty

    Annual equivalent full-load hours convert the seasonal energy into an annual ground heat exchange quantity, which is used to compute the multi-year temperature penalty from load imbalance.

  5. What pipe material is most widely used for residential closed-loop ground heat exchangers in the US, and why?

    Answer: High-density polyethylene (HDPE), for flexibility, chemical resistance, and heat-fused leak-free joints

    HDPE is the industry standard because it withstands ground movement, resists corrosion and biological attack, and can be thermally fused to create joints with no mechanical fittings underground.

  6. A residential geothermal system shows a progressively declining COP over several heating seasons. Which design oversight is the most likely cause?

    Answer: Thermally unbalanced annual loads causing cumulative ground temperature depression

    When annual heating extraction greatly exceeds cooling rejection, the mean ground temperature drops each year, reducing EWT and heat pump COP over time.

  7. Which regulatory or certification body administers the Certified Residential Geothermal Designer (CRD) credential in the United States?

    Answer: IGSHPA (International Ground Source Heat Pump Association)

    IGSHPA administers the CRD credential, which validates competency in ground-source heat pump system design for residential applications.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. igshpa.org — Renewal, fees, eligibility, score validity · verified Oct 2026
  2. csagroup.org — Test delivery, exam format, passing score, renewal, retake policy, score release, time limit, score validity · verified Oct 2026