  1. What is the purpose of a pressure test performed on a closed-loop geothermal ground loop before system startup?

    Answer: To verify loop integrity by detecting leaks before backfilling or system connection

    Pressure testing the loop prior to backfill and connection confirms there are no leaks in the piping that would cause fluid loss and system failure.

  2. According to IGSHPA standards, what minimum pressure is recommended for loop pressure testing, and how long should it be held?

    Answer: 100 psi for at least 30 minutes with no pressure drop

    IGSHPA recommends at least 100 psi for a minimum of 30 minutes to reliably detect small leaks in the ground loop before backfilling.

  3. During commissioning, a technician purges air from the closed loop using a high-velocity purge cart. Why is complete air removal critical?

    Answer: Air pockets reduce heat transfer efficiency and can cause pump cavitation

    Air in the loop disrupts flow, reduces heat transfer, and can damage the circulating pump through cavitation, so thorough purging is essential.

  4. What antifreeze concentration is typically verified during commissioning of a closed-loop system in a US climate where ground temperatures may drop below 32°F?

    Answer: Sufficient concentration to provide freeze protection to at least 10°F below the minimum expected EWT

    Antifreeze must be concentrated enough to protect the loop fluid to at least 10°F below the minimum design entering water temperature to prevent freeze damage.

  5. Which performance metric is used to evaluate a geothermal system's cooling efficiency during commissioning?

    Answer: Energy Efficiency Ratio (EER) or Cooling COP

    EER or Cooling COP compares cooling output to electrical input at specific test conditions, giving an instantaneous measure of cooling efficiency.

  6. What action should a commissioning technician take if the measured system COP is significantly below the manufacturer's rated value under similar conditions?

    Answer: Investigate loop flow rate, refrigerant charge, air handler airflow, and entering water temperature before accepting the system

    A low COP has multiple potential causes that must be systematically diagnosed before the system is accepted or equipment replaced.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. igshpa.org — Renewal, fees, eligibility, score validity · verified Oct 2026
  2. csagroup.org — Test delivery, exam format, passing score, renewal, retake policy, score release, time limit, score validity · verified Oct 2026