IGSHPA Certified Residential Geothermal Designer (CRD) — Questions and Answers
Question 1: What is the purpose of a pressure test performed on a closed-loop geothermal ground loop before system startup?
- To measure the static ground pressure at loop depth
- To verify loop integrity by detecting leaks before backfilling or system connection (Correct answer)
- To calibrate the heat pump refrigerant circuit
- To determine soil permeability for loop sizing
Correct answer: To verify loop integrity by detecting leaks before backfilling or system connection
Pressure testing the loop prior to backfill and connection confirms there are no leaks in the piping that would cause fluid loss and system failure.
Question 2: Which monitoring system capability allows a geothermal contractor to diagnose operational faults and review performance data without an on-site visit?
- Manual weekly inspection logs completed by the homeowner
- Standard analog thermostat with a paper log attached for homeowner use
- Web-connected smart thermostat or building automation system with geothermal-compatible remote access (Correct answer)
- Pneumatic control system with local gauge readouts
Correct answer: Web-connected smart thermostat or building automation system with geothermal-compatible remote access
Web-connected smart thermostats and cloud-enabled building automation systems transmit real-time performance data and fault codes, enabling remote diagnostics and proactive maintenance.
Question 3: What is the PRIMARY reason for regulatory compliance in the Certified Residential Geothermal Designer profession?
- To justify higher service fees
- To create additional paperwork
- To avoid penalties and fines only
- To protect public safety, ensure quality, and maintain professional integrity (Correct answer)
Correct answer: To protect public safety, ensure quality, and maintain professional integrity
Regulatory compliance protects public safety, ensures quality, and maintains professional integrity.
Question 4: When two or more geothermal heat pumps serve a single residence, which control strategy best equalizes wear and extends equipment life?
- Always run the same unit as the lead and use the second only as emergency backup
- Alternate units on a fixed 24-hour time-of-day schedule
- Run all units simultaneously at all times regardless of load
- Lead-lag sequencing with automatic runtime hour balancing between units (Correct answer)
Correct answer: Lead-lag sequencing with automatic runtime hour balancing between units
Lead-lag control with runtime equalization automatically rotates which unit leads, ensuring both accumulate similar operating hours and neither experiences disproportionate wear.
Question 5: A designer is evaluating a pond loop for a residential system. What minimum pond volume (in acre-feet) per ton of system capacity is generally recommended?
- 10 acre-ft per ton
- 5 acre-ft per ton
- 1.5 acre-ft per ton (Correct answer)
- 0.25 acre-ft per ton
Correct answer: 1.5 acre-ft per ton
Approximately 1.5 acre-feet of pond volume per ton of heating/cooling capacity is the commonly cited minimum to provide adequate thermal mass and recovery.
Question 6: What is the BEST way for a Certified Residential Geothermal Designer professional to stay current with regulatory changes?
- Check regulations only during renewal
- Monitor regulatory bodies, attend CE, and participate in professional associations (Correct answer)
- Depend on colleagues to share updates
- Rely solely on employer notifications
Correct answer: Monitor regulatory bodies, attend CE, and participate in professional associations
Staying current requires monitoring agencies, attending CE, and participating in professional associations.
Question 7: Why is maintenance important in Installation Standards & Environmental Compliance?
- To keep systems running efficiently (Correct answer)
- To shorten system lifespan.
- To increase energy bills.
- To ignore leaks.
Correct answer: To keep systems running efficiently
Regular maintenance is vital for ensuring the continuous efficient operation of geothermal systems, which is a key aspect of both installation standards and environmental compliance. It helps prevent performance degradation, extends the system's lifespan, and ensures it continues to meet its designed energy efficiency targets. This minimizes its environmental footprint and operational costs.
Question 8: A residential geothermal designer is comparing two loop configurations with different installed costs. Which analysis method should be used to determine which provides better long-term value?
- Flipping a coin since both configurations provide the same energy output
- Choosing the configuration with the highest installed cost to ensure quality
- Lifecycle cost analysis comparing total costs including installation, operation, and maintenance over the project life (Correct answer)
- Selecting the configuration with the lowest installed cost regardless of operating costs
Correct answer: Lifecycle cost analysis comparing total costs including installation, operation, and maintenance over the project life
Lifecycle cost analysis is the proper tool for comparing alternatives because a higher upfront cost can yield lower total cost through reduced energy consumption.
Question 9: Which factor is critical in Ground Loop & Heat Pump Configuration?
- Random equipment selection.
- Skipping insulation.
- Accurate load calculation (Correct answer)
- Ignoring building size.
Correct answer: Accurate load calculation
Accurate load calculation is critical because it precisely determines a building's heating and cooling requirements. This ensures the geothermal heat pump and ground loop are correctly sized, preventing inefficiencies from oversizing or undersizing, and guaranteeing optimal system performance and comfort.
Question 10: Which window property most directly affects the cooling load from solar radiation?
- Center-of-glass R-value
- U-factor
- Visible Light Transmittance (VLT)
- Solar Heat Gain Coefficient (SHGC) (Correct answer)
Correct answer: Solar Heat Gain Coefficient (SHGC)
SHGC measures the fraction of incident solar radiation admitted through a window, making it the primary factor for solar-driven cooling loads.
Question 11: When assessment results for a Certified Residential Geothermal Designer evaluation are inconclusive, the BEST practice is to:
- Delay reporting until results are favorable
- Discard the results and start over
- Conduct additional assessment using alternative methods (Correct answer)
- Report the results as definitive anyway
Correct answer: Conduct additional assessment using alternative methods
Inconclusive results require additional assessment using alternative methods for triangulation.
Question 12: Which regulatory requirement is UNIVERSAL across all Certified Residential Geothermal Designer practice settings?
- Using specific proprietary software
- Maintaining current certification and continuing education (Correct answer)
- Limiting services to local jurisdictions
- Working exclusively during business hours
Correct answer: Maintaining current certification and continuing education
Maintaining current certification and continuing education is a universal regulatory requirement.
Question 13: In a residential geothermal installation, why is it important to verify that the circuit breaker size matches the unit's Maximum Overcurrent Protection (MOP) rating on the nameplate?
- Correct breaker sizing ensures adequate short circuit and overload protection without nuisance tripping (Correct answer)
- The MOP rating determines the minimum wire gauge only
- Oversized breakers save energy by reducing voltage drops
- Breaker size affects the COP rating of the heat pump
Correct answer: Correct breaker sizing ensures adequate short circuit and overload protection without nuisance tripping
Installing a breaker at or below the nameplate MOP rating ensures proper overcurrent protection that safely interrupts faults while allowing normal starting current without nuisance trips.
Question 14: What type of wiring installation is required for geothermal ground loop electrical connections that transition from underground to inside the building?
- THHN conductors run in open air above the ground surface only
- Standard residential NM-B cable run along the foundation
- Direct burial-rated cable or appropriate conductors in listed conduit (Correct answer)
- Low-voltage thermostat wire rated for 24V
Correct answer: Direct burial-rated cable or appropriate conductors in listed conduit
Underground electrical connections to flow center pumps must use UF-B (underground feeder) direct burial cable or THWN/THWN-2 conductors in listed conduit rated for wet locations.
Question 15: What voltage supply is most commonly used for residential geothermal heat pump compressors in the United States?
- 277V single-phase
- 480V three-phase
- 208/230V single-phase (Correct answer)
- 120V single-phase
Correct answer: 208/230V single-phase
Residential geothermal heat pumps in the US are designed for 208/230V single-phase power, which is the standard service voltage available in most homes.
Question 16: When documenting assessment findings in CRD practice, which approach is MOST appropriate?
- Include only positive findings
- Record objective findings, measurements, and observations factually (Correct answer)
- Use jargon only experts understand
- Summarize verbally without written documentation
Correct answer: Record objective findings, measurements, and observations factually
Assessment documentation must be objective, factual, and comprehensive.
Question 17: What is 'thermal short-circuiting' in a vertical borehole and how is it mitigated?
- Heat transfer between the supply and return pipes within the same bore; mitigated by using thermally enhanced grout and proper pipe spacing (Correct answer)
- Fluid bypassing the heat pump; fixed by adding a check valve
- Ground water infiltration into the borehole; fixed by casing
- Electrical short in the pump motor; fixed by grounding
Correct answer: Heat transfer between the supply and return pipes within the same bore; mitigated by using thermally enhanced grout and proper pipe spacing
Thermal short-circuiting occurs when heat from the warmer pipe leg transfers directly to the cooler leg inside the bore, reducing efficiency; proper grout and U-tube spacing reduce it.
Question 18: Which documentation practice BEST demonstrates regulatory compliance for CRD certified professionals?
- Filing documents only when audited
- Relying on memory for routine procedures
- Maintaining organized, dated, and signed records of all activities (Correct answer)
- Keeping informal handwritten notes
Correct answer: Maintaining organized, dated, and signed records of all activities
Organized, dated, and signed records demonstrate systematic regulatory compliance.
Question 19: Which financial instrument specifically designed for energy efficiency upgrades allows homeowners to finance geothermal installations through their property tax assessment?
- Property Assessed Clean Energy (PACE) financing (Correct answer)
- A USDA farm operating loan
- A standard home equity line of credit (HELOC)
- A manufacturer's deferred payment plan
Correct answer: Property Assessed Clean Energy (PACE) financing
PACE financing attaches repayment to the property tax bill rather than the individual, making it accessible to homeowners who lack equity for a HELOC.
Question 20: Which type of thermostat is most recommended for geothermal heat pump systems to prevent unnecessary auxiliary heat activation?
- Single-stage manual thermostat
- Two-stage thermostat with intelligent recovery (Correct answer)
- Standard programmable thermostat without staging
- Outdoor temperature-only reset thermostat
Correct answer: Two-stage thermostat with intelligent recovery
Two-stage thermostats with intelligent recovery gradually bring the space to setpoint using only the heat pump, avoiding premature activation of auxiliary resistance heat.
Question 21: In a geothermal heat pump system, what does an auxiliary heat 'lockout' control primarily accomplish?
- Prevents the system from operating during utility demand response events
- Locks out the ground loop pump when loop temperatures are too high
- Prevents the heat pump from running when outdoor temperatures exceed 65°F
- Prevents backup resistance heat from activating when the heat pump can adequately handle the load (Correct answer)
Correct answer: Prevents backup resistance heat from activating when the heat pump can adequately handle the load
An auxiliary heat lockout control inhibits backup resistance elements from energizing whenever the heat pump is capable of maintaining comfort, preserving system efficiency.
Question 22: In a variable-speed geothermal heat pump, what sensor signal most commonly modulates compressor speed?
- Loop entering water temperature (Correct answer)
- Outdoor air temperature
- Supply air static pressure
- Refrigerant discharge superheat
Correct answer: Loop entering water temperature
The entering water temperature (EWT) from the ground loop is the primary control signal that tells the variable-speed compressor how hard to work.
Question 23: What is the purpose of a pre-construction site assessment in residential geothermal project management?
- To identify site constraints such as setbacks, utility conflicts, soil conditions, and access for drilling equipment (Correct answer)
- To size the electrical panel for the home's appliances
- To determine the homeowner's credit score for financing
- To select interior paint colors for the mechanical room
Correct answer: To identify site constraints such as setbacks, utility conflicts, soil conditions, and access for drilling equipment
A pre-construction site assessment identifies physical constraints that affect loop placement, equipment access, and overall project feasibility before signing contracts.
Question 24: How frequently should ongoing assessments be conducted in Certified Residential Geothermal Designer practice?
- Once annually regardless of circumstances
- Only when required by external auditors
- At regular intervals and as conditions change (Correct answer)
- Only when problems are reported
Correct answer: At regular intervals and as conditions change
Ongoing assessments should follow established protocols and also respond to changing conditions.
Question 25: For geothermal system sizing, the peak cooling load is most influenced by:
- Solar heat gain through windows and roof (Correct answer)
- Duct leakage into unconditioned spaces
- Thermostat setpoint differential
- Ground loop entering water temperature in winter
Correct answer: Solar heat gain through windows and roof
Solar heat gain through glazing and roofing materials is typically the dominant driver of residential peak cooling loads in summer.
Question 26: A geothermal heat pump system has a COP of 4.0 in heating mode. If it delivers 48,000 BTU/hr of heat, how much electrical power does it consume?
- 4,000 W
- 12,000 W
- 3,500 W
- 3,517 W (Correct answer)
Correct answer: 3,517 W
Power = Output/COP = 48,000 BTU/hr ÷ 4.0 = 12,000 BTU/hr input; converting: 12,000 / 3.412 ≈ 3,517 W.
Question 27: Which factor is critical in Installation Standards & Environmental Compliance?
- Accurate load calculation (Correct answer)
- Random equipment selection.
- Skipping insulation.
- Ignoring building size.
Correct answer: Accurate load calculation
Accurate load calculation is fundamental to both proper installation and environmental compliance because it dictates the correct sizing of the geothermal system. An accurately sized system operates efficiently, reducing energy consumption and environmental impact. Conversely, an improperly sized system can lead to inefficiencies, increased energy use, and potential compliance issues.
Question 28: What is a common tool used in Residential Energy Efficiency & Load Calculations?
- Manual L.
- Manual X.
- Manual Z.
- Manual J and Manual S (Correct answer)
Correct answer: Manual J and Manual S
Manual J and Manual S are common tools used in Residential Energy Efficiency & Load Calculations. ACCA Manual J is the industry standard for calculating a building's heating and cooling loads, while Manual S is used for properly selecting and sizing HVAC equipment based on those load calculations. Together, they ensure optimal system design and performance.
Question 29: Which loop configuration is most appropriate for a residential site with limited land area but access to deep drilling?
- Horizontal slinky loops
- Pond/lake loops
- Vertical closed-loop boreholes (Correct answer)
- Surface water open-loop
Correct answer: Vertical closed-loop boreholes
Vertical closed-loop boreholes require a small surface footprint because heat exchange length is achieved by drilling deep rather than spreading horizontally.
Question 30: What documentation is typically required by a lender when a homeowner finances a geothermal system through a green energy loan program?
- Manufacturer's sales brochures without contractor quotes
- Only a verbal agreement with the installer
- Proof of homeowner's existing HVAC brand preference
- A signed contractor proposal, permit documentation, and evidence of system qualification such as ENERGY STAR certification (Correct answer)
Correct answer: A signed contractor proposal, permit documentation, and evidence of system qualification such as ENERGY STAR certification
Green energy lenders require contractor proposals, permits, and certification evidence to confirm the system qualifies for the program's favorable terms.
Question 31: In the IGSHPA design method, what does the 'run fraction' (PLF) account for?
- Fraction of time the heat pump operates at full load during the design month (Correct answer)
- Proportion of glycol to water in the heat transfer fluid
- Percentage of loop buried below frost line
- Ratio of horizontal to vertical loop length
Correct answer: Fraction of time the heat pump operates at full load during the design month
The part-load factor (PLF or run fraction) reflects that the heat pump cycles on and off, allowing the ground some thermal recovery between runs.
Question 32: How does the Net Present Value (NPV) method improve on simple payback when evaluating a geothermal investment?
- NPV accounts for the time value of money by discounting future energy savings to their present-day worth (Correct answer)
- NPV measures only the installation cost without considering savings
- NPV and simple payback produce identical results in all scenarios
- NPV ignores future savings and uses only first-year costs
Correct answer: NPV accounts for the time value of money by discounting future energy savings to their present-day worth
NPV discounts future cash flows at an assumed rate of return, providing a more accurate picture of true economic value than simple payback alone.
Question 33: What is the BEST way for a Certified Residential Geothermal Designer professional to stay current with regulatory changes?
- Depend on colleagues to share updates
- Check regulations only during renewal
- Rely solely on employer notifications
- Monitor regulatory bodies, attend CE, and participate in professional associations (Correct answer)
Correct answer: Monitor regulatory bodies, attend CE, and participate in professional associations
Staying current requires monitoring agencies, attending CE, and participating in professional associations.
Question 34: Which loop configuration is typically used when ground space is limited?
- Open loop.
- Vertical loop (Correct answer)
- Pond loop.
- Horizontal loop.
Correct answer: Vertical loop
A vertical loop configuration is typically used when ground space is limited because it involves drilling boreholes deep into the earth, allowing the pipes to extend vertically rather than horizontally across a large area. This design minimizes the surface footprint required for the ground heat exchanger while still providing effective heat transfer.
Question 35: What is the purpose of a flow center in a geothermal ground loop system?
- To distribute conditioned air evenly through the duct system
- To house the circulating pumps and provide a service/purging point for the ground loop (Correct answer)
- To control refrigerant flow rate inside the heat pump
- To monitor and log electrical power consumption of the system
Correct answer: To house the circulating pumps and provide a service/purging point for the ground loop
A flow center contains the ground loop circulating pumps, isolation valves, and purge ports, providing a single service location for the hydronic ground loop.
Question 36: When a CRD professional identifies a potential regulatory violation, the CORRECT first step is to:
- Address it only if directly affected
- Document the violation and report through proper channels (Correct answer)
- Discuss it casually with coworkers
- Wait to see if it resolves on its own
Correct answer: Document the violation and report through proper channels
Proper documentation and reporting through established channels ensures accountability.
Question 37: What is the primary function of a desuperheater in a residential geothermal heat pump system?
- Remove excess heat from the compressor housing
- Reduce electrical consumption during utility peak demand periods
- Pre-heat domestic hot water using waste heat from the refrigerant cycle (Correct answer)
- Regulate entering water temperature in the ground loop
Correct answer: Pre-heat domestic hot water using waste heat from the refrigerant cycle
A desuperheater captures high-temperature waste heat from the refrigerant before it reaches the condenser and uses it to pre-heat domestic hot water at no additional energy cost.
Question 38: In a hybrid geothermal system, a supplemental cooling tower is added primarily to:
- Provide backup heating when the heat pump is in defrost mode
- Pre-cool outdoor air before it enters the heat pump
- Supply condenser water to a conventional chiller as a backup
- Reject excess heat during cooling-dominated operation to reduce ground temperature rise (Correct answer)
Correct answer: Reject excess heat during cooling-dominated operation to reduce ground temperature rise
A cooling tower dissipates excess heat rejection in cooling-dominated climates, preventing long-term ground warming that would degrade heat pump COP over years.
Question 39: What is a common range for simple payback periods for residential geothermal heat pump installations in the US after applying federal tax credits?
- 30 to 50 years making them economically unattractive
- Exactly 7 years for all installations
- 5 to 15 years depending on local energy prices, load, and installation cost (Correct answer)
- Less than 1 year in all US climates
Correct answer: 5 to 15 years depending on local energy prices, load, and installation cost
After applying the 30% federal tax credit, most US residential geothermal installations see payback periods ranging from roughly 5 to 15 years depending on local conditions.
Question 40: What is the primary benefit of adding a buffer tank (or hydraulic separator) to a hydronic geothermal heat pump system?
- It filters sediment and contaminants from the loop fluid
- It adds thermal mass to prevent short cycling of the heat pump compressor (Correct answer)
- It balances electrical load across the three phases of service
- It stores excess ground loop antifreeze for seasonal use
Correct answer: It adds thermal mass to prevent short cycling of the heat pump compressor
A buffer tank provides thermal mass between the heat pump and the distribution system, ensuring the compressor runs for adequate minimum on-times and preventing short cycling.
Question 41: Which factor most significantly affects the simple payback period of a residential geothermal heat pump compared to a high-efficiency gas furnace and central AC system?
- The brand of the thermostat used
- The local cost of electricity versus natural gas and the heating/cooling load of the home (Correct answer)
- The number of bedrooms in the home
- The color of the heat pump cabinet
Correct answer: The local cost of electricity versus natural gas and the heating/cooling load of the home
Payback period is driven primarily by the energy cost differential between the geothermal system and the fossil fuel alternative it replaces.
Question 42: When a CRD professional identifies a potential regulatory violation, the CORRECT first step is to:
- Address it only if directly affected
- Wait to see if it resolves on its own
- Discuss it casually with coworkers
- Document the violation and report through proper channels (Correct answer)
Correct answer: Document the violation and report through proper channels
Proper documentation and reporting through established channels ensures accountability.
Question 43: Which of the following best describes 'degree-days' as used in energy consumption estimation?
- Number of days per year when heating is required
- Cumulative sum of daily mean temperature deviations from a base temperature (65°F) (Correct answer)
- Monthly average outdoor temperature minus indoor setpoint
- Total hours per year below freezing
Correct answer: Cumulative sum of daily mean temperature deviations from a base temperature (65°F)
Heating degree-days (HDD) sum the daily differences between 65°F and the average outdoor temperature, providing a seasonal measure of heating energy demand.
Question 44: What is the primary reason a designer would choose a slinky horizontal ground loop over a straight horizontal loop?
- More heat exchange surface area per linear trench foot (Correct answer)
- Better freeze protection in cold climates
- Easier pressure testing after installation
- Lower pumping energy due to reduced pipe length
Correct answer: More heat exchange surface area per linear trench foot
Slinky coils pack more pipe into each trench foot, increasing heat exchange area when land area is limited.
Question 45: What is the purpose of a pressure/temperature (P/T) port on a ground loop header?
- To measure entering and leaving water conditions without draining the system (Correct answer)
- To add antifreeze solution to the loop
- To connect the loop to the domestic hot water desuperheater
- To release excess loop pressure during thermal expansion
Correct answer: To measure entering and leaving water conditions without draining the system
P/T ports allow technicians to insert probes and read pressure and temperature data for diagnostics without breaking the sealed loop.
Question 46: When managing a residential geothermal project with multiple subcontractors (driller, plumber, electrician), what scheduling dependency is critical to sequence correctly?
- All trades must work simultaneously on the first day only
- The plumber must complete all work before drilling begins
- The electrician must complete all wiring before any drilling begins
- Drilling and loop installation must be complete before the plumber connects the loop to the heat pump, which must be set before the electrician wires it (Correct answer)
Correct answer: Drilling and loop installation must be complete before the plumber connects the loop to the heat pump, which must be set before the electrician wires it
The geothermal loop must be in the ground and connected before the heat pump can be powered and tested, establishing a strict sequential dependency.
Question 47: What is a common antifreeze used in closed-loop geothermal systems?
- Ethylene glycol
- Propylene glycol (Correct answer)
- Mineral oil.
- Water only.
Correct answer: Propylene glycol
Propylene glycol is a common antifreeze used in closed-loop geothermal systems because it lowers the freezing point of the circulating fluid, preventing damage to the pipes in cold conditions. It is preferred over ethylene glycol due to its lower toxicity, making it a safer and more environmentally friendly option for residential applications.
Question 48: A building has 2,400 sq ft of wall area with an overall U-factor of 0.065 BTU/hr·ft²·°F and a DTD of 65°F. What is the wall heat loss?
- 6,760 BTU/hr
- 15,600 BTU/hr
- 23,920 BTU/hr
- 10,140 BTU/hr (Correct answer)
Correct answer: 10,140 BTU/hr
Heat loss = U × Area × DTD = 0.065 × 2,400 × 65 = 10,140 BTU/hr.
Question 49: What is a common tool used in Installation Standards & Environmental Compliance?
- Manual Z.
- Manual X.
- Manual L.
- Manual J and Manual S (Correct answer)
Correct answer: Manual J and Manual S
Manual J and Manual S are industry-standard methodologies for calculating building heating/cooling loads and properly sizing HVAC equipment, respectively. Adhering to these manuals ensures that geothermal systems are designed to meet specific building requirements efficiently. This is a key aspect of both installation standards and environmental compliance for optimal performance and energy savings.
Question 50: What distinguishes a Certified Residential Geothermal Designer certified professional from a non-certified practitioner?
- There is no meaningful difference
- Certified professionals only work in larger organizations
- Certification validates competency through standardized assessment against benchmarks (Correct answer)
- Certified professionals always have more experience
Correct answer: Certification validates competency through standardized assessment against benchmarks
Certification provides objective validation of competency through standardized assessment.
IGSHPA Certified Residential Geothermal Designer (CRD)
The CRD certification, administered by IGSHPA, validates expertise in designing residential ground source heat pump systems, covering system design principles, load calculations, ground heat exchanger design, installation standards, controls, and economic analysis. The open-book exam requires a minimum 80% passing score.
Exam Rules
- You can skip questions and return to them later
- Flag questions for review before submitting
- No feedback shown until you submit the entire exam
- Unanswered questions count as wrong — answer everything
- 10 pretest questions are mixed in and don't affect your score
- Timer auto-submits when time runs out
- Your progress is auto-saved every 30 seconds
These practice questions were written with AI tools. They are not real exam questions. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- igshpa.org — Renewal, fees, eligibility, score validity · verified Oct 2026
- csagroup.org — Test delivery, exam format, passing score, renewal, retake policy, score release, time limit, score validity · verified Oct 2026