CQIA Process Analysis & Improvement Techniques 3 — Questions and Answers
Question 1: A quality team wants to understand the sequence of steps in a billing process and identify where errors occur. The most appropriate tool is:
- Affinity diagram
- Flowchart (Correct answer)
- Box plot
- Run chart
Correct answer: Flowchart
A flowchart (process map) visually sequences all steps, decisions, and branches, making it easy to spot where errors may enter.
Question 2: Which of the following is NOT one of the eight wastes (DOWNTIME) identified in lean thinking?
- Defects
- Overproduction
- Necessary inspection (Correct answer)
- Non-utilized talent
Correct answer: Necessary inspection
Necessary inspection is not a lean waste category; the eight wastes (DOWNTIME) are Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, and Extra-processing.
Question 3: In process improvement, 'takt time' is calculated as:
- Total cycle time divided by number of operators
- Available production time divided by customer demand rate (Correct answer)
- Total defects divided by total opportunities
- Processing time divided by lead time
Correct answer: Available production time divided by customer demand rate
Takt time equals available production time divided by customer demand, setting the pace the process must meet.
Question 4: A team uses a swim lane diagram instead of a standard flowchart. The main advantage of swim lanes is that they:
- Show statistical variation in process output
- Clarify which person or department performs each step (Correct answer)
- Display the frequency distribution of process times
- Prioritize improvement opportunities by impact
Correct answer: Clarify which person or department performs each step
Swim lanes add horizontal or vertical lanes for each role or department, making handoffs and responsibilities clear.
Question 5: Which improvement approach follows the sequence: Define, Measure, Analyze, Improve, Control?
- PDCA
- DMAIC (Correct answer)
- 8D Problem Solving
- Kaizen
Correct answer: DMAIC
DMAIC (Define, Measure, Analyze, Improve, Control) is the structured Six Sigma methodology for improving existing processes.
Question 6: A process has a cycle time of 4 minutes per unit and a takt time of 3 minutes per unit. This situation indicates:
- The process is producing faster than demand requires
- The process cannot keep up with customer demand (Correct answer)
- The process is perfectly balanced to demand
- The process has excess capacity
Correct answer: The process cannot keep up with customer demand
When cycle time exceeds takt time, the process is too slow to meet demand, signaling a need for improvement or additional capacity.
Question 7: A '5 Why' analysis for a machine stoppage concludes that the root cause is an inadequate preventive maintenance schedule. This root cause is best addressed by:
- Retraining the operator who last used the machine
- Adding a second inspection after the process step
- Revising the PM schedule to include the overlooked task (Correct answer)
- Installing a backup machine for redundancy
Correct answer: Revising the PM schedule to include the overlooked task
Addressing root cause means fixing the PM schedule that allowed the failure, not treating symptoms like the operator or adding inspection.
A quality team wants to understand the sequence of steps in a billing process and identify where errors occur.
The most appropriate tool is: