  1. A quality team wants to track the frequency of defect types over a two-week period. Which data collection tool is MOST appropriate?

    Answer: Check sheet

    A check sheet is a structured form for collecting and tabulating data about defect frequencies over time.

  2. In a histogram, what does a bimodal distribution (two peaks) most likely indicate?

    Answer: Two distinct populations or process shifts

    A bimodal histogram typically indicates two distinct subpopulations or process conditions mixed in the data.

  3. Which of the following BEST describes stratification as a data analysis technique?

    Answer: Separating data into subgroups to identify patterns

    Stratification divides data into subgroups (e.g., by shift, machine, or operator) to reveal hidden patterns or causes.

  4. A Pareto chart is based on which underlying principle?

    Answer: A vital few categories account for most of the problems

    The Pareto principle states that roughly 80% of problems come from 20% of causes, guiding focus on the vital few.

  5. When constructing a scatter diagram, what does a data point cluster along a positive diagonal indicate?

    Answer: A positive correlation between variables

    Points clustering along a positive diagonal show that as one variable increases, the other tends to increase as well.

  6. Which sampling method ensures every member of a population has an equal chance of being selected?

    Answer: Simple random sampling

    Simple random sampling gives every unit an equal and independent probability of selection, eliminating selection bias.

  7. A run chart shows seven consecutive data points all above the centerline. What does this pattern signal?

    Answer: A potential special cause or process shift

    Seven or more consecutive points on one side of the centerline is a run rule indicating a likely special cause.