Sampling Plans & Acceptance Sampling Flashcards
7 cards from real CQI practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Sampling Plans & Acceptance Sampling flashcards as text
Skip-lot sampling is most appropriately applied when:
Answer: A supplier has demonstrated consistently high quality over an extended period
Skip-lot sampling reduces inspection frequency by sampling only a fraction of submitted lots, and is appropriate only when a supplier has established a strong history of submitting conforming lots.
In sequential sampling, after inspecting each item the inspector makes a decision to:
Answer: Accept the lot, reject the lot, or continue sampling
Sequential sampling evaluates one item at a time and plots cumulative results against acceptance and rejection lines, making an accept, reject, or continue decision after each unit.
Average Total Inspection (ATI) is a metric that measures:
Answer: The average number of units inspected per lot, including 100% inspection of rejected lots under rectifying inspection
ATI accounts for the sample inspection of accepted lots plus the 100% screen of rejected lots, giving the expected total number of items inspected per lot over the long run.
Under ANSI/ASQ Z1.4, the inspection level primarily determines:
Answer: The relationship between lot or batch size and sample size
The inspection level controls the amount of inspection relative to lot size by mapping lot size ranges to sample size code letters, which then index into sampling plan tables.
A Type A OC curve differs from a Type B OC curve in that Type A applies to:
Answer: Isolated lots, while Type B applies to a continuing series of lots from an ongoing process
Type A OC curves are constructed for isolated individual lots using the hypergeometric distribution, while Type B curves apply to lots from a continuing process using the binomial or Poisson distribution.
In a variables acceptance sampling plan using the k-method, a lot is accepted when:
Answer: The sample mean is at least k standard deviations away from the nearest specification limit
The k-method accepts the lot when (X̄ − LSL)/σ ≥ k and/or (USL − X̄)/σ ≥ k, ensuring the process mean is sufficiently far from specification limits.
Chain sampling (ChSP-1) allows a lot with one defective item to be accepted if:
Answer: The preceding 'i' samples each had zero defectives
In ChSP-1, a lot with exactly one defective can be accepted provided the previous i samples (under the same plan) each contained zero defectives, borrowing quality history to make the decision.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- asq.org — Eligibility, exam format, score release, renewal, score validity, passing score, retake policy, fees, retake fee, registration deadline · verified Oct 2026
- prometric.com — Test delivery · verified Oct 2026