  1. An environmental impact assessment for a new park facility is required under NEPA when:

    Answer: A federal nexus such as funding or permits exists

    NEPA triggers an environmental review whenever a proposed action involves federal funding, permits, or land, requiring assessment of environmental effects.

  2. Which green infrastructure element is specifically designed to capture and filter stormwater runoff in park settings?

    Answer: Bioswale

    Bioswales are vegetated channels designed to slow, filter, and absorb stormwater runoff, improving water quality and reducing flooding.

  3. A community needs assessment for park planning should gather data from which combination of sources?

    Answer: A mix of community surveys, focus groups, usage data, and stakeholder interviews

    A comprehensive needs assessment triangulates quantitative data with qualitative input for a complete picture of community needs.

  4. Joint-use agreements with schools benefit park agencies primarily by:

    Answer: Expanding public access to facilities without requiring the park agency to build or own them

    Joint-use agreements allow communities to share facilities like gyms and fields, increasing public access to recreation space at lower capital cost.

  5. CPTED principles applied to parks include:

    Answer: Designing open sight lines, adequate lighting, and clear boundaries that naturally deter criminal activity

    CPTED uses physical design strategies — visibility, lighting, defined spaces — to reduce opportunities for crime without relying solely on enforcement.

  6. A trail feasibility study should primarily assess:

    Answer: Connectivity to destinations, user demand, terrain, environmental impacts, and cost

    Trail feasibility studies evaluate connectivity, user demand, topography, environmental constraints, and development costs to determine viability.