When inspecting a concrete pour, at what point should an inspector collect a slump test sample?
-
A
After the concrete has been placed in the forms
-
B
At the point of discharge from the truck, after discarding the first portion
-
C
At the batch plant before loading
-
D
At the end of the truck discharge when the drum is nearly empty