← All CNG Flashcard Decks

Emergency Procedures and Response Flashcards

7 cards from real CNG practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Emergency Procedures and Response flashcards as text
  1. If a CNG fuel dispenser shows an unexplained pressure spike during a fueling operation, the operator should:

    Answer: Stop fueling immediately and notify a supervisor

    Unexplained pressure anomalies may indicate equipment malfunction or system failure; stopping fueling and notifying a supervisor prevents a potential incident.

  2. If a fire breaks out at a CNG compressor at a fueling station, the FIRST action should be:

    Answer: Activate the emergency shutdown system and evacuate all personnel

    The emergency shutdown (ESD) system cuts all gas flow and electrical power simultaneously; evacuation protects personnel while the system mitigates the hazard.

  3. The primary combined hazard when entering a confined space where CNG may be present is:

    Answer: Oxygen-deficient atmosphere and potentially explosive gas concentration

    CNG displaces oxygen in confined spaces creating asphyxiation risk, and accumulated gas within the 5–15% range creates an explosive atmosphere.

  4. A CNG fueling station should be evacuated immediately when:

    Answer: A gas odor is detected anywhere on the premises

    Gas odor indicates an active leak that could reach a flammable concentration; immediate evacuation removes personnel and eliminates potential ignition sources.

  5. Which type of communication device should NOT be used near an active CNG leak site?

    Answer: Standard non-rated portable radios or consumer cell phones

    Standard radios and cell phones can produce electrical arcs or sparks that may ignite a flammable gas-air mixture.

  6. After a CNG incident at a fueling station is controlled, fueling operations may resume only after:

    Answer: A qualified inspector certifies the system is safe and all documentation is complete

    Qualified inspection ensures all systems are structurally sound and safe, while documentation creates a required record of the incident before operations resume.

  7. The emergency shutdown (ESD) system at a CNG fueling station is designed to:

    Answer: Simultaneously cut all natural gas flow and electrical power to prevent fire spread

    The ESD system simultaneously isolates the gas supply and de-energizes electrical systems, eliminating both fuel and ignition sources in a single action.