When performing a lockout/tagout (LOTO) procedure on a CNC machine, what is the correct sequence of steps?
-
A
Notify affected employees, shut down equipment, isolate energy sources, apply locks
-
B
Apply locks first, then shut down, then notify employees
-
C
Isolate energy sources, apply locks, then start the machine to verify
-
D
Shut down, verify zero energy, then notify employees