← All CMM Flashcard Decks

Preventive & Predictive Maintenance Flashcards

7 cards from real CMM practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Preventive & Predictive Maintenance flashcards as text
  1. Which failure pattern, described in the Nowlan and Heap studies, shows a high early failure rate that decreases to a constant rate?

    Answer: Infant mortality

    Infant mortality patterns show many early failures from defects or installation errors, then a steady low rate.

  2. Given that many failures follow an infant mortality pattern, what risk is associated with overly frequent intrusive PM?

    Answer: It can introduce new defects through disassembly and reassembly

    Each intrusive task can reset the asset to its vulnerable early-life period by introducing errors.

  3. Motor circuit analysis or insulation resistance testing with a megohmmeter is primarily used to detect what?

    Answer: Deteriorating winding insulation

    Megger testing measures insulation resistance to identify winding degradation before a motor fails.

  4. Which is the best source of data for adjusting PM frequencies over time?

    Answer: Equipment failure history and inspection findings recorded in the CMMS

    Historical failure and findings data show whether intervals are too long or too short.

  5. Ultrasonic thickness testing is most useful in building systems for which purpose?

    Answer: Measuring pipe and tank wall loss from corrosion

    Ultrasonic thickness gauges measure remaining wall thickness, revealing corrosion or erosion.

  6. What is a key advantage of a route-based PM program for building rounds?

    Answer: Technicians complete multiple inspections efficiently in a logical sequence

    Routes group nearby tasks to minimize travel time and improve consistency.

  7. Which equipment should generally receive priority when allocating limited PdM resources?

    Answer: Critical assets whose failure has high safety, operational, or cost consequences

    Criticality ranking directs monitoring effort where failures would hurt most.

How this page was made: written with AI tools. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. learn.nahro.org — Eligibility, fees, score validity · verified Oct 2026
  2. nahro.org — Renewal, retake policy · verified Oct 2026