Practice Test Geeks home

Civil Engineering PE Basic Civil Engineering PE 5

In a soil consolidation test, the time to reach 50% consolidation (t_50) is 10 minutes for a 1-inch thick doubly drained sample.
What is the coefficient of consolidation c_v?

Select your answer