Welfare Facilities and Environmental Legislation Flashcards
6 cards from real CITB MANAGERS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Welfare Facilities and Environmental Legislation flashcards as text
Under the Noise and Statutory Nuisance Act 1993, construction noise between which hours is most likely to constitute a statutory nuisance for residential neighbours?
Answer: Before 7:30 AM and after 6 PM on weekdays, and at any time on Sundays — though this varies by local authority guidance
Construction noise outside standard daytime hours (typically before 7:30–8:00 AM and after 6:00 PM on weekdays, and any time on Sundays) is more likely to constitute a statutory nuisance under the Environmental Protection Act 1990. Local authorities use Section 60 notices to enforce restrictions.
Why must vegetation clearance on construction sites be timed carefully?
Answer: The nesting season for wild birds (broadly March to August) means clearance during this period risks disturbing active nests, which is a criminal offence under the Wildlife and Countryside Act 1981
All wild bird species and their active nests are protected by law. Clearance of vegetation, hedgerows, and trees during the nesting season (broadly March–August) must be preceded by a nesting bird check. If active nests are found, work must stop until the young have fledged.
The Water Framework Directive (as retained in UK law) establishes objectives for the ecological status of water bodies. In practical terms, what does this require of construction projects near watercourses?
Answer: That the ecological status of the watercourse is not deteriorated by construction activities — preventing silt, pollution, and physical damage from causing a worsening of status
The Water Framework Directive requires that waterbodies do not deteriorate in ecological status. For construction, this means preventing silt runoff, fuel and chemical spills, and physical changes that could damage aquatic ecology, invertebrates, and fish habitats.
A construction project on a contaminated brownfield site must include:
Answer: A ground investigation and contaminated land assessment before construction begins, with a remediation strategy for any significant contamination found — agreed with the local authority as a planning condition
Brownfield sites commonly contain contaminants (hydrocarbons, heavy metals, asbestos, PAHs) that require ground investigation before construction. A remediation strategy (soil removal, treatment, or encapsulation) must be agreed with the local authority and implemented before or during construction.
The principal contractor must manage waste on site in accordance with the waste hierarchy. Which construction waste is most commonly sent to landfill, contrary to best practice?
Answer: Mixed waste — when different waste types are not segregated, materials that could be recycled are sent to landfill as mixed waste, wasting resources and failing the waste hierarchy
Lack of waste segregation on site results in recyclable materials (clean timber, metal, cardboard, plasterboard) being sent to landfill as mixed waste. Segregating waste at source maximises recycling and reduces costs. It is both an environmental and duty-of-care obligation.
What is a 'site waste management plan' (SWMP) and what must it record?
Answer: A document that identifies the types and quantities of waste the project will generate, the intended management route for each (reuse, recycle, dispose), the waste carrier details, and the actual disposal records — used to demonstrate duty of care compliance
A SWMP (voluntarily best practice in England since the 2012 revocation of the mandatory requirement for projects over £300,000) records: waste types and estimated quantities, management routes (reuse, recycle, dispose), carrier registration numbers, disposal facility addresses, and actual waste records. It demonstrates active duty-of-care management.
How this page was made: written with AI tools. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- citb.co.uk — Retake policy, score release, exam format, passing score, time limit, test delivery, eligibility, fees · verified Oct 2026