  1. A site manager must manage the risk of fatigue affecting workers on long-duration projects. Which legislative framework is most relevant?

    Answer: The Working Time Regulations 1998 (limiting working hours, mandatory rest periods, and annual leave), supported by the risk assessment requirements of the Management Regulations

    The Working Time Regulations 1998 limit working hours to 48 hours per week average (workers can opt out), require 11 hours' consecutive rest per day, and 24 hours' rest per week. These are legal minimums; the site manager should also consider the management of fatigue as part of the health and safety risk assessment.

  2. What is the purpose of a 'pre-start meeting' held with subcontractors before they begin work on site?

    Answer: To confirm the subcontractor understands the site rules, their RAMS has been approved, welfare facilities and site access arrangements are confirmed, their workers have been inducted, and any interface with other contractors has been identified and managed

    The pre-start meeting ensures that before a subcontractor begins work: their RAMS is approved, their workers are inducted, they understand site rules and emergency procedures, welfare arrangements are confirmed, and any interfaces with other activities are coordinated.

  3. A site manager must ensure that an accident book is maintained on site. Under what legislation is this required?

    Answer: The Social Security (Claims and Payments) Regulations 1979 require accident records; RIDDOR 2013 also requires records of reportable incidents — both contribute to the on-site accident book requirement

    The Social Security (Claims and Payments) Regulations 1979 require employers to record details of accidents at work. RIDDOR 2013 requires records of reportable incidents. The accident book (or electronic equivalent) satisfies both requirements. GDPR considerations mean modern accident books must be structured to protect personal data.

  4. A project requires working in hot weather conditions for an extended period. What health risk must the site manager address?

    Answer: Heat stress (hyperthermia) — which can cause heat exhaustion and heatstroke and must be managed through: shade and rest provision, adequate cool water, adjusting working hours to avoid peak heat, and monitoring workers for symptoms

    Heat stress is a serious health risk in hot weather. Site managers must: provide shade and rest areas, ensure access to cool drinking water, consider rescheduling high-intensity work away from peak heat, implement a buddy system to watch for symptoms (confusion, loss of coordination), and have a response plan for heat illness.

  5. A site manager must ensure that compressed gas cylinders (LPG, oxygen, acetylene) are safely managed on site. Which of the following is correct storage practice?

    Answer: Store upright and secured against falling, in a ventilated outdoor area, away from ignition sources and direct sunlight, with oxygen and fuel gases stored separately (minimum 3 metres apart or fire-rated barrier)

    Cylinders must be: stored upright and secured; in a ventilated outdoor cage away from ignition sources; oxygen and fuel gases separated by at least 3 metres or a fire-resistant wall; away from direct sunlight and heat sources. Acetylene should not be stored near oxygen as a leak in an oxygen-enriched atmosphere creates an explosion risk.

  6. What is a 'Pre-Construction Health and Safety Review' and when does it typically take place?

    Answer: A review held before construction begins to confirm that the principal contractor, principal designer, and client have fulfilled their CDM pre-construction duties — including CPP preparation, pre-construction information provision, welfare planning, and emergency procedure drafting

    A pre-construction H&S review checks that all CDM pre-construction requirements are in place before work starts: the CPP is adequate, pre-construction information has been provided, welfare is planned, emergency procedures are drafted, and all duty holder appointments are confirmed. It is good practice on all projects and often contractually required.

How this page was made: written with AI tools. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. citb.co.uk — Retake policy, score release, exam format, passing score, time limit, test delivery, eligibility, fees · verified Oct 2026