Risk Assessment and Method Statements Flashcards
6 cards from real CITB MANAGERS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Risk Assessment and Method Statements flashcards as text
A RAMS document includes a risk assessment and a method statement. What does RAMS stand for?
Answer: Risk Assessment and Method Statement
RAMS stands for Risk Assessment and Method Statement. The two documents are often produced together as a RAMS package, covering both the identified risks and the specific method by which the work will be controlled and carried out safely.
Before a complex task begins on site, operatives should be briefed on the RAMS. This briefing is most effective when:
Answer: It is conducted in person, workers can ask questions and demonstrate understanding, and attendance is signed
RAMS briefings must ensure workers understand the risks and controls before they start. An in-person briefing allows for questions, demonstration of understanding, and a signed attendance record. A signature on an unread document provides no protection.
A risk assessment identifies that a specific task requires two persons to carry it out safely. The site manager decides to proceed with one person to save time. This is:
Answer: A breach of the safe system of work — the risk assessment determines how many persons are required for safe working
The risk assessment and method statement specify the resources (including number of workers) required for the task to be carried out safely. Proceeding with fewer resources than specified breaches the safe system of work and creates unacceptable risk.
What is the purpose of a 'near miss' report in the risk assessment process?
Answer: To provide data for improving risk assessments and preventing future incidents — near misses indicate that existing controls may be insufficient
Near-miss reports are a vital source of information showing that risk assessments and controls may not be working effectively. Analysing near-miss data allows preventive improvements to be made before a serious injury occurs.
When should a method statement for a high-risk activity be submitted to the principal contractor?
Answer: Before the activity commences, giving the principal contractor sufficient time to review and approve it
Method statements for high-risk activities must be submitted and approved by the principal contractor (or their representative) before the work begins. This allows for review, modification if needed, and confirmation that the proposed approach is consistent with the CPP.
Which of the following factors would increase the risk rating in a risk assessment matrix?
Answer: Increasing the severity of potential harm or the likelihood of an incident occurring
A risk rating increases when either the severity of potential harm increases or the likelihood of an incident occurring increases. Reducing frequency, increasing controls, or installing engineering controls all reduce the risk rating.
How this page was made: written with AI tools. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- citb.co.uk — Retake policy, score release, exam format, passing score, time limit, test delivery, eligibility, fees · verified Oct 2026