According to IPC-7711, what must be done before performing any rework on a Class 3 assembly?
-
A
The assembly must be tested to verify the defect location
-
B
Written procedures and engineering authorization must be in place
-
C
The entire board must be cleaned with IPA
-
D
The rework technician must hold an IPC-A-610 CIS certification