- Which of the following correctly describes a 'tagout' device under 29 CFR 1910.147? β A prominent warning device that cannot be removed without deliberate action
- Under OSHA's Section 11(c) anti-retaliation provisions, an employer is prohibited from taking adverse action against a worker who: β Reports a safety concern or participates in an OSHA inspection
- What is the purpose of a tag line during a crane lift? β To control load swing and rotation without personnel being in the load path
- A Job Hazard Analysis (JHA) should be reviewed and updated when which of the following occurs? β An incident or near-miss occurs
- When using a safety net system, what is the maximum distance the net can be placed below the working surface? β 30 feet
- Under OSHA 1926.502, what is the minimum mid-rail height for a guardrail system? β Between 21 and 31 inches above the walking surface
- In a construction site safety program, what does the acronym 'SDS' stand for, and which federal agency mandates its use under the Hazard Communication Standard? β Safety Data Sheet, mandated by OSHA
- Under OSHA's Lockout/Tagout standard (29 CFR 1910.147), who is generally the only person authorized to remove a lock or tag from an energy isolating device? β The employee who initially applied the lock or tag.
- Which type of energy is specifically addressed by the term 'stored energy' in LOTO procedures? β Residual energy such as capacitors, springs, or pressurized fluids
- A construction supervisor observes a worker using an extension cord with a damaged outer jacket. The BEST immediate corrective action is to: β Remove the cord from service and replace it with an undamaged cord
- Which of the following correctly describes 'heave' in the context of excavation hazards? β Upward movement of the trench bottom caused by soil pressure differential
- Under 29 CFR 1926.150, a fire extinguisher rated not less than 2A must be provided for each how many square feet of protected building area? β 3,000 sq ft
- Which biological health hazard should a CHST be most concerned about when workers disturb bird or bat droppings during building renovation? β Histoplasma capsulatum
- Which OSHA standard specifically governs training requirements for employees exposed to fall hazards in construction? β 29 CFR 1926.503
- Under OSHA's Hazard Communication Standard (HazCom 2012 / GHS), what training must workers receive when a new chemical hazard is introduced to the workplace? β Training on the new hazard must be provided before workers are exposed to it
- Under OSHA's respiratory protection standard (29 CFR 1910.134), what must be completed before a worker is assigned a respirator? β Medical evaluation, fit testing, and training
- What is the primary purpose of conducting a root cause analysis after a construction site incident? β To identify the underlying systemic factors that led to the incident
- According to OSHA, what is the minimum safe distance a crane boom must maintain from energized power lines rated up to 350 kV? β 20 feet
- Which exposure route is MOST significant for lead exposure on construction sites involving lead-based paint removal? β Ingestion via hand-to-mouth contact
- When developing an emergency response plan for a multi-employer construction site, who has the primary responsibility for coordinating the plan? β The general contractor or controlling employer
- A competent person inspects an excavation after a rainstorm. What is the MOST important action if the walls show signs of tension cracking? β Remove all workers and reassess protective systems
- Under OSHA 29 CFR 1926 Subpart P, who is qualified to classify soil at an excavation site? β A competent person with soil classification training
- Which of the following best describes the 'Fatal Four'βthe leading causes of construction fatalities identified by OSHA? β Falls, electrocution, struck-by, caught-in/between
- A crane operator receives conflicting hand signals from two workers during a lift. What should the operator do? β Stop the crane and do not move until one designated signal person is identified
- When investigating a near-miss event involving a scaffold plank failure, the investigator should FIRST: β Photograph and preserve the scene before disturbance
- A worker is sandblasting a structure coated with lead paint. Which combination of respiratory protection is MOST appropriate? β Supplied-air respirator (SAR) in pressure-demand mode
- What is the maximum permissible noise exposure for a construction worker at 95 dBA without hearing protection under OSHA standards? β 4 hours
- Which of the following scenarios would require an arc flash hazard analysis per NFPA 70E on a construction site? β Working on energized electrical equipment operating at 50 volts or more
- During a confined space rescue emergency on a construction site, a non-entry rescue method is preferred primarily because: β It prevents additional casualties by keeping rescuers out of the hazardous atmosphere
- Under the OSHA Heat Illness Prevention guidance, which physiological sign indicates heat stroke rather than heat exhaustion? β Altered mental status and hot, dry or wet skin