  1. In coastal areas, what minimum wave height distinguishes a Coastal High Hazard Area (Zone VE) from Zone AE?

    Answer: 3.0 feet

    Zone VE is mapped where breaking waves of 3 feet or more are expected during the base flood.

  2. The Limit of Moderate Wave Action (LiMWA) on a FIRM marks the inland limit of what wave height?

    Answer: 1.5 feet

    The LiMWA marks the inland extent of 1.5-foot breaking waves, bounding the Coastal A Zone.

  3. A developer wants FEMA's comment on whether a proposed channel project would change the SFHA before construction begins. What should be requested?

    Answer: CLOMR

    A CLOMR is FEMA's comment on a proposed project that would change hydrologic or hydraulic characteristics.

  4. Under 44 CFR 65.3, within how long must a community notify FEMA of physical changes affecting flood hazards once technical data are available?

    Answer: 6 months

    Communities must submit technical data for changes affecting BFEs as soon as practicable but no later than six months after the information becomes available.

  5. After FEMA issues a Letter of Final Determination for new FIRMs, how long does the community generally have to adopt compliant floodplain regulations before the maps take effect?

    Answer: 6 months

    The LFD starts a six-month compliance period before the new FIRM becomes effective.

  6. How long is the statutory appeal period for proposed new or modified flood hazard information after the second Federal Register/newspaper publication?

    Answer: 90 days

    The 90-day appeal period begins after the second newspaper publication of proposed flood hazard determinations.

  7. Which FEMA program delivers quality flood maps along with non-regulatory products such as depth grids and Changes Since Last FIRM to support risk communication?

    Answer: Risk MAP

    Risk MAP (Mapping, Assessment, and Planning) succeeded Map Mod and adds non-regulatory flood risk products.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. illinoisfloods.org — Fees, test delivery, exam information · verified Nov 2026
  2. floods.org — Late registration, eligibility, fees, exam format, passing score, renewal, retake fee, retake policy, score release, time limit · verified Nov 2026