CFM Cheat Sheet 2026

The 30 highest-yield CFM facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.

180 questions
240 min time limit
65% to pass
  1. What is the recommended minimum ambient light level for general office task work according to IESNA (Illuminating Engineering Society)? 30 foot-candles
  2. What is a primary consideration when planning space utilization in a facility? Ensuring that the space meets the functional needs of occupants
  3. A facility manager is reviewing a contract's 'force majeure' clause. This clause is designed to: Excuse non-performance when extraordinary events beyond either party's control occur
  4. Which standard provides the most widely recognized framework for emergency management in the United States? NIMS (National Incident Management System)
  5. During a facilities project kickoff meeting, what is the most important communication goal? Aligning all stakeholders on scope, roles, and expectations
  6. Which document assigns specific emergency response roles and responsibilities to facility staff? The Emergency Response Plan (ERP)
  7. What is active listening in the context of FM stakeholder communication? Fully concentrating, understanding, and responding thoughtfully to what a stakeholder says
  8. What does a 'churn rate' measure in the context of workplace facility management? The percentage of the workforce that moves, adds, or changes workstations in a year
  9. Which approach BEST describes competitive sealed bidding in public-sector facility procurement? Bids are publicly opened, and award goes to the lowest responsive, responsible bidder
  10. A facility manager needs to select a contractor for a major renovation. Which procurement method offers the best cost transparency? Competitive sealed bidding (hard bid)
  11. What is the primary role of a Certified Facility Manager in facilities operations? Overseeing the maintenance and operation of building systems
  12. A facility manager wants to ensure continuous competition and price benchmarking for ongoing services. The BEST contract strategy is to use: Short-term contracts with option years rather than long fixed-term agreements
  13. A facility manager wants to reduce potable water consumption. Which strategy has the highest impact in a commercial office building? Installing low-flow fixtures in restrooms and upgrading cooling tower water management
  14. Which of the following maintenance strategies is considered the most proactive, utilizing condition-monitoring tools to forecast equipment failures? Predictive Maintenance (PdM)
  15. Which of the following is a direct benefit of implementing a waste diversion program in a facility? Reduced landfill costs and lower environmental impact
  16. A Key Performance Indicator (KPI) in a facility service contract is BEST described as: A measurable metric used to evaluate vendor performance against contractual obligations
  17. A facility manager is asked to calculate the seats-to-headcount ratio for a 500-person company using 400 workstations. What is the ratio? 0.8:1
  18. Under ASHRAE 62.1, minimum ventilation rates for office spaces are based primarily on which two factors? Occupant density and floor area
  19. Which ADA-mandated minimum clear floor width is required for accessible corridors in US commercial buildings? 36 inches
  20. What is the primary function of the U.S. EPA's ENERGY STAR Portfolio Manager tool for a facility manager? To benchmark and track the building's energy, water, and waste data over time.
  21. A facility manager implementing a space consolidation strategy primarily aims to: Reduce total occupancy costs by shrinking the real estate footprint
  22. Which standard provides guidelines for accessible parking space dimensions and quantities in US commercial facilities? ADA Standards for Accessible Design
  23. Which WELL Building Standard feature directly addresses thermal comfort and its impact on occupant productivity? WELL Feature T01 – Thermal Performance
  24. Which financial concept describes the principle that money available today is worth more than the same amount in the future? Time Value of Money
  25. A performance bond in a facilities construction or service contract guarantees that: The contractor will complete the project according to contract terms
  26. Which document formally records the planned versus actual performance of an FM service over a reporting period? Performance scorecard
  27. What is the primary purpose of a Service Level Agreement (SLA) in facility management communications? To define expected service standards and response times between FM and clients
  28. A facility manager receives conflicting instructions from two senior leaders. What is the best first step? Document both instructions and escalate the conflict for clarification
  29. Which IFMA tool is specifically designed to help facility managers collect and compare operational cost and utilization data? IFMA Benchmarking Survey
  30. Bid Process Who obtains comprehensive insurance for contractors? The contractor