When assessing an existing subfloor for a new flooring installation, what is the FIRST step a CFI installer should perform?
-
A
Apply a skim coat of leveling compound
-
B
Conduct a visual and physical inspection for structural integrity, moisture, and flatness
-
C
Sand the entire surface
-
D
Install a new layer of underlayment immediately