Question 1: Which hydrologic parameter represents the fraction of rainfall that becomes surface runoff?
- Runoff coefficient (C) (Correct answer)
- Infiltration rate
- Evapotranspiration rate
- Time of concentration
Correct answer: Runoff coefficient (C)
The runoff coefficient (C) in the Rational Method represents the proportion of rainfall that converts to runoff, ranging from 0 to 1.
Question 2: A detention basin designed to reduce peak discharge by storing runoff temporarily is classified as which type of BMP?
- Retention basin
- Detention basin (Correct answer)
- Bioretention cell
- Constructed wetland
Correct answer: Detention basin
A detention basin temporarily stores runoff and releases it at a controlled rate to reduce peak flows, unlike retention basins which hold water permanently.
Question 3: Under the NPDES Construction General Permit, a Stormwater Pollution Prevention Plan (SWPPP) must be prepared for sites disturbing at least how many acres?
- 0.5 acres
- 1 acre (Correct answer)
- 2 acres
- 5 acres
Correct answer: 1 acre
The NPDES CGP requires a SWPPP for construction sites disturbing 1 or more acres, or smaller sites in a common plan of development exceeding 1 acre.
Question 4: Which factor most directly increases the peak runoff rate from a developed watershed compared to pre-development conditions?
- Increased vegetative cover
- Reduced impervious surface
- Shorter time of concentration (Correct answer)
- Increased soil infiltration capacity
Correct answer: Shorter time of concentration
Development shortens time of concentration by replacing permeable surfaces with impervious ones and adding channels, causing runoff to reach the outlet faster and intensifying peak flows.
Question 5: What is the primary purpose of a level spreader at the outlet of a stormwater conveyance system?
- Increase flow velocity to prevent sedimentation
- Convert concentrated flow to sheet flow (Correct answer)
- Filter sediment from runoff
- Store runoff during peak events
Correct answer: Convert concentrated flow to sheet flow
A level spreader converts concentrated pipe or channel flow into diffuse sheet flow, reducing erosive velocities before runoff enters a vegetated buffer.
Question 6: In the context of green infrastructure, which practice captures rooftop runoff for reuse or infiltration directly at the source?
- Bioswale
- Rain barrel or cistern (Correct answer)
- Dry swale
- Riprap outlet
Correct answer: Rain barrel or cistern
Rain barrels and cisterns capture and store rooftop runoff at the point of generation, reducing the volume that enters the storm drainage system.
Question 7: Which condition is most likely to cause a stormwater detention pond to fail its design function during a storm event?
- Outlet pipe set at the pond bottom elevation
- Vegetation established on embankment slopes
- Sediment accumulation reducing storage volume (Correct answer)
- Emergency spillway installed at the top of the embankment
Correct answer: Sediment accumulation reducing storage volume
Sediment accumulation in a detention pond reduces its live storage volume, decreasing the pond's ability to attenuate peak flows as designed.
Question 8: Which curve number (CN) value in the TR-55 method indicates the LEAST runoff potential from a given soil and land use combination?
- 98
- 85
- 70
- 35 (Correct answer)
Correct answer: 35
Lower curve numbers indicate greater infiltration and less runoff potential; a CN of 35 represents a highly permeable soil with dense vegetation, while 98 represents nearly impervious surfaces.
Question 9: What term describes the practice of directing rooftop downspouts away from impervious surfaces and toward vegetated areas to promote infiltration?
- Downspout disconnection (Correct answer)
- Cistern overflow routing
- Drywell injection
- Curb elimination
Correct answer: Downspout disconnection
Downspout disconnection redirects roof drainage to lawns, gardens, or rain gardens rather than directly into the storm sewer, reducing runoff volume.
Question 10: A permeable pavement system fails to drain adequately after several years of use. What is the most likely cause?
- Excessive rainfall intensity during storms
- Clogging of pores by fine sediments and debris (Correct answer)
- Structural failure of the aggregate base
- Tree root intrusion into the pavement surface
Correct answer: Clogging of pores by fine sediments and debris
Fine sediment and organic debris accumulate in the pores of permeable pavement over time, reducing infiltration rates and requiring vacuum sweeping maintenance.
Question 11: Which NRCS hydrologic soil group has the HIGHEST runoff potential due to very slow infiltration rates?
- Group A
- Group B
- Group C
- Group D (Correct answer)
Correct answer: Group D
Hydrologic Soil Group D soils (such as clays) have very slow infiltration rates, high runoff potential, and are typically wet, shallow, or have impermeable layers.
Question 12: During a CESSWI inspection, you observe that a site's temporary sediment basin outlet riser is submerged with no freeboard remaining. What is your immediate concern?
- Increased sediment removal efficiency
- Potential overtopping and embankment failure (Correct answer)
- Reduced hydraulic head causing slow drainage
- Sedimentation of the outlet pipe
Correct answer: Potential overtopping and embankment failure
When freeboard is lost, the embankment is at risk of overtopping, which can cause rapid erosion and catastrophic failure of the sediment basin.
Question 13: Which of the following best describes the concept of 'water quality volume' (WQv) in stormwater management?
- The total annual runoff volume from a site
- The volume of runoff from a design storm used to size water quality BMPs (Correct answer)
- The maximum volume a detention pond can hold before overtopping
- The volume of groundwater recharge achieved annually
Correct answer: The volume of runoff from a design storm used to size water quality BMPs
Water quality volume is the runoff volume from a specified small storm (often 1-inch or the 90th percentile event) used to size BMPs for pollutant removal and volume reduction.
Question 14: What is the primary mechanism by which a vegetated filter strip reduces stormwater pollutant loads?
- Chemical precipitation of dissolved pollutants
- Sedimentation and infiltration as sheet flow passes through dense vegetation (Correct answer)
- Biological uptake by plant roots in the filter strip
- Aeration of runoff to oxidize contaminants
Correct answer: Sedimentation and infiltration as sheet flow passes through dense vegetation
Vegetated filter strips slow sheet flow, allowing sediment to settle and runoff to infiltrate, removing particulate-bound pollutants from stormwater.
Question 15: Which stormwater management approach focuses on managing runoff at or near its source to mimic predevelopment hydrology?
- End-of-pipe treatment
- Low Impact Development (LID) (Correct answer)
- Traditional gray infrastructure
- Regional retention basins
Correct answer: Low Impact Development (LID)
Low Impact Development (LID) uses distributed, small-scale practices to infiltrate, evapotranspire, and reuse stormwater close to where it falls, mimicking natural hydrology.
Question 16: A bioretention cell is designed to treat stormwater through which primary set of processes?
- Filtration, adsorption, biological uptake, and infiltration (Correct answer)
- Chemical coagulation and flocculation
- Gravity settling in a quiescent pool
- UV disinfection and chlorination
Correct answer: Filtration, adsorption, biological uptake, and infiltration
Bioretention cells treat runoff through physical filtration through engineered media, adsorption to soil particles, biological uptake by plants, and infiltration into native soils.
Question 17: Under what condition should a CESSWI inspector recommend immediate corrective action for a stormwater BMP?
- When the BMP was installed more than 2 years ago
- When the BMP is functioning within 10% of design capacity
- When BMP failure poses an imminent threat to water quality or public safety (Correct answer)
- When sediment has accumulated to 25% of the design storage volume
Correct answer: When BMP failure poses an imminent threat to water quality or public safety
Immediate corrective action is warranted when a BMP failure poses an imminent threat to water quality, downstream flooding, or public safety, regardless of maintenance schedules.
Question 18: Which design element of a wet detention pond is specifically intended to increase sediment removal efficiency?
- Emergency spillway
- Forebay at the inlet (Correct answer)
- Rip-rap outlet protection
- Anti-seep collar on the barrel
Correct answer: Forebay at the inlet
A forebay is a pre-settling chamber at the pond inlet that captures coarse sediment before it reaches the main pool, reducing maintenance frequency and improving overall efficiency.
Question 19: What is the primary regulatory driver for municipalities to develop Stormwater Management Programs (SWMPs) under the MS4 program?
- Clean Air Act Section 112
- Safe Drinking Water Act
- NPDES Phase I and Phase II regulations under the Clean Water Act (Correct answer)
- Resource Conservation and Recovery Act
Correct answer: NPDES Phase I and Phase II regulations under the Clean Water Act
MS4 stormwater programs are required under NPDES Phase I (large/medium municipalities) and Phase II (small municipalities) regulations promulgated under the Clean Water Act.
Question 20: Which scenario represents an illicit discharge to a storm sewer system?
- Stormwater runoff entering an inlet during a rainstorm
- Sanitary sewer overflow entering a storm drain through a cross-connection (Correct answer)
- Groundwater infiltration into a storm drain pipe
- Clean water from a firefighting operation draining to a storm inlet
Correct answer: Sanitary sewer overflow entering a storm drain through a cross-connection
A sanitary sewer cross-connection that allows sewage to enter the storm drain is a classic illicit discharge, introducing pathogens and pollutants into waterways.
Question 21: When computing peak discharge using the Rational Method (Q = CiA), what units must drainage area 'A' be expressed in for the formula to yield flow in cubic feet per second?
- Square feet
- Square miles
- Acres (Correct answer)
- Hectares
Correct answer: Acres
In the Rational Method as commonly applied in the US, area must be in acres, rainfall intensity in inches per hour, and C is dimensionless, yielding Q in cubic feet per second.
Which hydrologic parameter represents the fraction of rainfall that becomes surface runoff?
What Practice Test Geeks adds beyond an AI chat for CESSWI
An AI chatbot can quiz you, but it can't reproduce the exam conditions or keep your record. Here you get:
- A timed, full-length CESSWI mock exam โ 100 questions in 120 minutes with a 75% pass mark, modeled on the official exam's question count and time limit, followed by a score report broken down by exam domain.
- A fixed CESSWI question bank: the same test every attempt, so your score is comparable from one try to the next instead of changing with every regenerated quiz.
- Progress saved on your device: completed tests, scores and missed questions stay in My Progress, so you can retake only what you got wrong.
- A printable CESSWI cheat sheet you can print or save as a PDF.
- CESSWI flashcards built from the same question bank.
Practice questions written with AI assistance and published by Nathan Beja, founder of Practice Test Geeks. They are not real exam questions. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- envirocert.org โ Eligibility, fees, renewal, score validity, test delivery, score release, retake fee ยท verified Nov 2026