← All CESCO Flashcard Decks

Environmental Regulations & Compliance Flashcards

7 cards from real CESCO practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Environmental Regulations & Compliance flashcards as text
  1. How often must an SPCC Plan be reviewed and evaluated at minimum?

    Answer: Every 5 years

    40 CFR 112.5(b) requires SPCC Plan review and evaluation at least once every five years.

  2. A construction project will disturb 1.5 acres of land. What federal stormwater requirement most likely applies?

    Answer: NPDES Construction General Permit coverage with a SWPPP

    Construction activities disturbing one acre or more require NPDES stormwater permit coverage and a SWPPP.

  3. Under NEPA, a federal agency that finds through an Environmental Assessment that its action will not significantly affect the environment issues a:

    Answer: Finding of No Significant Impact (FONSI)

    An EA concluding no significant impact results in a FONSI, so no EIS is needed.

  4. Federal underground storage tank (UST) regulations for petroleum and hazardous substances are established under which statute?

    Answer: RCRA Subtitle I

    RCRA Subtitle I governs USTs, including release detection, corrosion protection, and financial responsibility.

  5. Under EPA's Audit Policy, to qualify for penalty mitigation a facility generally must disclose a discovered violation in writing within:

    Answer: 21 days

    The Audit Policy requires written disclosure to EPA within 21 days of discovering the violation.

  6. Industrial facilities needing stormwater coverage in states where EPA is the permitting authority typically obtain coverage under which permit?

    Answer: Multi-Sector General Permit (MSGP)

    EPA's Multi-Sector General Permit covers stormwater discharges from industrial activities by sector.

  7. Large Quantity Generator personnel who handle hazardous waste must complete initial training and then a review:

    Answer: Annually

    40 CFR 262.17 requires LQG personnel to take part in an annual review of their initial hazardous waste training.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. nrep.org — Renewal, score validity, eligibility, test delivery, passing score, fees, retake fee · verified Oct 2026