An I-MR chart shows the individual values chart in control, but the moving range chart has a point above the upper control limit. What should be investigated first?
-
A
Whether the process mean has shifted
-
B
Whether a single large jump occurred between two consecutive observations
-
C
Whether the subgroup size should be increased
-
D
Whether the specification limits need revision