During audit planning, an auditor discovers that a manufacturing plant operates three shifts per day. How does this affect the audit strategy?
-
A
Shift schedules are irrelevant to energy audits
-
B
The auditor should schedule site visits across all shifts to capture load variations
-
C
Only the day shift needs to be audited
-
D
The audit scope should be reduced to save time