Construction Site BMPs and Implementation Flashcards
6 cards from real CEPSCI practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Construction Site BMPs and Implementation flashcards as text
Erosion control blankets (ECBs) are primarily used to:
Answer: Protect seeded slopes from rainfall impact and erosion until vegetation is established
ECBs provide physical protection of seeded soil from rainfall impact and surface runoff while vegetation germinates and establishes, after which the blanket may degrade or be removed.
What is the minimum recommended maintenance interval for silt fences under the US NPDES CGP?
Answer: At least every 7 business days and within 24 hours after a 0.25-inch or greater storm event
The NPDES Construction General Permit requires inspections at least every 7 business days and within 24 hours of qualifying rain events to ensure BMPs are functioning properly.
What is the purpose of a 'slope drain' or 'temporary slope drain pipe'?
Answer: To convey concentrated runoff down a slope without causing erosion by protecting the slope surface from flow
Slope drains are pipes anchored to the slope surface that convey concentrated runoff from the top to the bottom of a slope without allowing the flow to contact and erode the slope face.
Which of the following is an example of a 'good housekeeping' BMP on a construction site?
Answer: Properly storing and disposing of concrete washout water in a designated lined area
Good housekeeping practices manage materials, waste, and spills to prevent pollutants other than sediment — such as concrete, fuel, or paint — from reaching stormwater.
When is it appropriate to use polyacrylamide (PAM) as an erosion control amendment?
Answer: As a soil amendment applied to disturbed soils to reduce erosion, typically in conjunction with seeding and mulching
PAM is an anionic polymer that binds soil particles together, reducing erosion and improving water quality when applied to disturbed soils along with other BMPs.
What is the correct approach when a BMP is found to have failed or to be inadequate during an inspection?
Answer: Repair or replace the BMP as soon as practicable, typically within a defined timeframe required by the permit
Permits typically require prompt repair of failed BMPs, often within 24 hours or before the next rain event, to maintain continuous erosion and sediment control.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- clemson.edu — Renewal, eligibility, exam format, passing score, retake policy, score validity, fees, registration deadline, retake fee, test delivery · verified Oct 2026