Construction Site Best Management Practices Flashcards
6 cards from real CEPSCI practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Construction Site Best Management Practices flashcards as text
What maintenance is required for silt fence to ensure it remains effective?
Answer: Regular inspection for tears, undermining, and sagging, plus sediment removal when accumulation reaches one-third of fence height
Silt fence must be regularly inspected for damage, and accumulated sediment must be removed when it reaches one-third of the fence height to maintain flow-through capacity and prevent overtopping.
Where should silt fence NOT be installed?
Answer: In areas of concentrated flow such as drainage channels or swales
Silt fence is designed for sheet flow conditions only; in concentrated flow areas the hydraulic forces exceed the fence's capacity, causing it to fail and potentially creating a worse problem.
A soil stockpile on a construction site should be managed by:
Answer: Surrounding it with sediment controls and covering it with mulch or tarps to prevent erosion
Stockpiles must be surrounded with sediment controls such as silt fence or berms and covered with mulch or tarps to protect exposed soil from rain erosion.
What is the recommended maximum contributing drainage area for a standard silt fence installation?
Answer: 0.25 acres per 100 linear feet of fence
Silt fence is designed for small drainage areas, typically no more than 0.25 acres per 100 linear feet of fence, because larger contributing areas generate flows that overwhelm the fabric's limited capacity.
Vehicle tracking controls should extend from the paved road onto the construction site at least:
Answer: 50 feet or until natural road surface is reached
A stabilized construction entrance should extend at least 50 feet from the paved road surface to allow vehicles sufficient travel distance to dislodge mud from tires before reaching pavement.
Which of the following is a source control BMP rather than a treatment BMP?
Answer: Phased construction limiting the area of disturbance
Source controls prevent sediment from being generated in the first place by limiting disturbed area, while treatment BMPs capture sediment after it has been mobilized; source controls are always preferable.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- clemson.edu — Renewal, eligibility, exam format, passing score, retake policy, score validity, fees, registration deadline, retake fee, test delivery · verified Oct 2026