Pollution Prevention & Waste Management Flashcards
7 cards from real CEM practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Pollution Prevention & Waste Management flashcards as text
Municipal solid waste landfills are primarily regulated under which RCRA subtitle and CFR part?
Answer: Subtitle D, 40 CFR 258
MSW landfill criteria are set under RCRA Subtitle D in 40 CFR Part 258.
Landfill gas generated by anaerobic decomposition is composed mainly of:
Answer: Methane and carbon dioxide
Landfill gas is roughly half methane and half carbon dioxide.
The federal Subtitle D composite liner design calls for a flexible membrane over at least 2 feet of compacted soil with a hydraulic conductivity no greater than:
Answer: 1 × 10^-7 cm/sec
40 CFR 258.40 requires the compacted soil layer to be no more permeable than 1 × 10^-7 cm/sec.
Disposal of PCB-containing equipment with PCB concentrations of 50 ppm or greater is regulated mainly under:
Answer: TSCA, 40 CFR Part 761
PCBs are regulated under TSCA in 40 CFR Part 761, with 50 ppm as a key threshold.
Asbestos removal and disposal during building demolition is federally regulated under:
Answer: The Clean Air Act asbestos NESHAP
The asbestos NESHAP under the Clean Air Act covers demolition, renovation, and disposal practices.
EPA's 2015 rule regulates coal combustion residuals (coal ash) from electric utilities as:
Answer: Solid waste under Subtitle D
The 2015 CCR rule regulates coal ash disposal as non-hazardous solid waste under Subtitle D.
How long may a small quantity handler of universal waste accumulate universal waste on-site?
Answer: 1 year
Universal waste handlers may accumulate waste for up to one year from generation.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- ndep.nv.gov — Eligibility, score release, test delivery, exam format, passing score, retake policy, test dates, time limit, fees · verified Nov 2026
- leg.state.nv.us — Score validity · verified Nov 2026