Industry Regulations & Compliance Flashcards
7 cards from real CEM practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Industry Regulations & Compliance flashcards as text
A facility must prepare an SPCC plan if its aggregate aboveground oil storage capacity exceeds which amount (counting containers of 55 gallons or more)?
Answer: 1,320 gallons
SPCC applies when aboveground oil capacity exceeds 1,320 gallons and a discharge to navigable waters could reasonably be expected.
How often must an SPCC plan be reviewed and evaluated by the owner or operator?
Answer: Every 5 years
40 CFR 112.5(b) requires an SPCC plan review at least once every five years.
What is the maximum term of an NPDES permit issued under the Clean Water Act?
Answer: 5 years
NPDES permits are issued for fixed terms not exceeding five years.
Which agency primarily issues Clean Water Act Section 404 permits for discharge of dredged or fill material into waters of the U.S.?
Answer: U.S. Army Corps of Engineers
The Army Corps of Engineers administers the Section 404 program, with EPA oversight and veto authority.
NPDES permittees typically report their effluent sampling results to the regulatory authority using which form?
Answer: Discharge Monitoring Report (DMR)
DMRs are the standard periodic reports of effluent monitoring data under NPDES permits.
An industrial facility that discharges process wastewater only to a municipal sewer system is primarily regulated under which program?
Answer: National Pretreatment Program
Indirect dischargers to POTWs are governed by the National Pretreatment Program and local sewer use ordinances.
Under the CWA oil discharge rule, a release of oil to navigable waters must be reported to the National Response Center when it:
Answer: Causes a film or sheen on the water surface
The 'sheen rule' in 40 CFR 110 makes any discharge causing a sheen, sludge, or emulsion reportable regardless of volume.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- ndep.nv.gov — Eligibility, score release, test delivery, exam format, passing score, retake policy, test dates, time limit, fees · verified Nov 2026
- leg.state.nv.us — Score validity · verified Nov 2026