Environmental Compliance & Regulations Flashcards
7 cards from real CEM practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Environmental Compliance & Regulations flashcards as text
A new major source proposed in a nonattainment area must meet which control technology standard?
Answer: LAER
Nonattainment New Source Review requires the Lowest Achievable Emission Rate along with emission offsets.
Prevention of Significant Deterioration (PSD) permits for new major sources in attainment areas require which control standard?
Answer: BACT
PSD requires Best Available Control Technology, set case by case with energy, environmental, and economic impacts considered.
MACT standards for hazardous air pollutants are issued under which Clean Air Act program?
Answer: NESHAP under Section 112
Section 112 NESHAPs set technology-based MACT standards for major sources of HAPs.
Under TSCA, PCB-containing materials are generally regulated at or above what concentration?
Answer: 50 ppm
TSCA regulations at 40 CFR 761 generally apply to PCBs at concentrations of 50 ppm or more.
A facility covered under EPA's Multi-Sector General Permit for industrial stormwater must develop and implement which document?
Answer: Stormwater Pollution Prevention Plan (SWPPP)
The MSGP requires a SWPPP that identifies pollutant sources and the control measures used.
Construction activities must obtain NPDES stormwater permit coverage when they disturb at least how much land?
Answer: 1 acre
Construction disturbing one acre or more, or part of a larger common plan of that size, needs NPDES stormwater coverage.
An industrial facility discharging wastewater to a municipal sewer (POTW) rather than directly to surface water is primarily regulated by what?
Answer: National Pretreatment Program standards
Indirect dischargers must meet pretreatment standards under CWA Section 307(b) and local POTW limits.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- ndep.nv.gov — Eligibility, score release, test delivery, exam format, passing score, retake policy, test dates, time limit, fees · verified Nov 2026
- leg.state.nv.us — Score validity · verified Nov 2026