When reviewing electrical plans for a commercial building, which document takes precedence if the drawings conflict with the specifications?
-
A
Specifications always govern over drawings
-
B
Drawings always govern over specifications
-
C
The more stringent requirement governs
-
D
The AHJ determines which document governs on a case-by-case basis