Industry Knowledge Flashcards
5 cards from real CDT practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 5 Industry Knowledge flashcards as text
Which of the following is typically the first phase in the construction project lifecycle?
Answer: Programming
Programming is typically the initial phase in the construction project lifecycle, where the owner's needs, goals, and functional requirements for the project are thoroughly identified and documented. This phase defines the project's scope, budget, and schedule. It lays the essential groundwork before any design work begins, ensuring the project aligns with client expectations.
What is the primary purpose of the "Project Manual" in construction documentation?
Answer: To include contract forms, conditions, and specifications
The Project Manual is a comprehensive binder that complements the construction drawings by providing all the written legal and technical requirements for a project. It typically contains contract forms, general and supplementary conditions, and the detailed specifications that describe materials, workmanship, and quality standards. This forms a complete set of instructions for the contractor, ensuring clarity and compliance.
Which of the following describes the "Design-Bid-Build" delivery method?
Answer: The owner hires a design team first, then solicits bids for construction
In the Design-Bid-Build delivery method, the owner first contracts with an architect or design team to complete the project's design documents. Once the design is finalized, these documents are then used to solicit competitive bids from various contractors. The lowest qualified bidder is typically awarded the construction contract, separating design from construction in a sequential process.
Which of the following is an example of a Division in the CSI MasterFormat?
Answer: Concrete
The CSI MasterFormat is a widely used standard for organizing construction specifications and other project information into a hierarchical system of divisions and sections. 'Concrete' is an example of a specific material or trade that falls under one of these divisions (typically Division 03 - Concrete). This provides a standardized way to categorize construction components, making documents easier to navigate and understand.
Which project delivery method is characterized by early involvement of the contractor during the design phase to assist with cost and constructability?
Answer: Construction Management at Risk (CMAR)
Construction Management at Risk (CMAR) is a project delivery method where the owner hires a Construction Manager (CM) early in the design phase. The CM provides pre-construction services, offering expertise on cost, schedule, and constructability. They then guarantee a maximum price for the construction, taking on the risk for project delivery and ensuring cost control.