Safety Standards & Hazardous Material Handling Flashcards

7 cards from real CDS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Safety Standards & Hazardous Material Handling flashcards as text
  1. During implosion demolition prep, what is the FIRST step in sequencing explosive placement to ensure controlled progressive collapse?

    Answer: Identify and target primary load-bearing columns and supports in a timed sequence

    Controlled implosion requires targeting primary structural supports in a precisely timed sequence to direct the collapse inward and downward.

  2. What is the regulatory requirement under NESHAP (40 CFR Part 61, Subpart M) regarding notification before demolishing a commercial building with friable asbestos?

    Answer: Notify the state or local agency at least 10 working days before demolition

    NESHAP requires written notification to the appropriate state or local agency at least 10 working days before demolition of any facility with regulated asbestos-containing material.

  3. Which SDS section provides information on proper PPE selection for workers handling a hazardous demolition waste chemical?

    Answer: Section 8 – Exposure Controls/Personal Protection

    SDS Section 8 contains exposure limits, engineering controls, and specific PPE recommendations for handling the chemical safely.

  4. A demolition project in a residential area must control fugitive dust emissions. Which EPA regulation provides the primary framework for dust emission controls at demolition sites?

    Answer: PM10 and PM2.5 NAAQS under the Clean Air Act

    The EPA's NAAQS standards for PM10 and PM2.5 particulate matter under the Clean Air Act provide the regulatory framework for controlling fugitive dust from demolition.

  5. When using a hydraulic excavator with a shear attachment during steel structure demolition, what is the most critical safety concern regarding overhead hazards?

    Answer: Falling steel members striking workers or equipment below the cut zone

    Hydraulic shears cutting steel members create unpredictable falling hazards; establishing and enforcing a drop zone exclusion area beneath the cut is the primary safety requirement.

  6. Under OSHA's Hazard Communication Standard (HazCom 2012), what labeling element on a container of demolition-related chemical waste must indicate immediate danger to health?

    Answer: Signal word such as 'DANGER' or 'WARNING'

    HazCom 2012 requires signal words ('DANGER' for severe hazards, 'WARNING' for less severe) to immediately alert workers to the level of health risk.

  7. Which document must accompany the off-site shipment of hazardous demolition waste and must be retained by the generator for at least three years?

    Answer: EPA hazardous waste manifest (Form 8700-22)

    The EPA hazardous waste manifest (Form 8700-22) must accompany all hazardous waste shipments and be retained by the generator for a minimum of three years.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. demolitionassociation.com — Test delivery, test dates, score validity, fees, exam format, passing score, retake fee, retake policy, score release · verified Oct 2026