Blueprint Reading & Specifications Flashcards
7 cards from real CDS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Blueprint Reading & Specifications flashcards as text
On structural demolition drawings, what does the abbreviation 'EXG' or 'EXIST.' typically indicate?
Answer: An existing condition already present on-site
'EXG' or 'EXIST.' labels elements that are already in place and must be accounted for during demolition planning.
A legend on a demolition drawing shows a solid black fill pattern. This most commonly indicates which condition?
Answer: Material to be demolished and removed
A solid black or heavy cross-hatch fill pattern in demolition drawings conventionally marks materials scheduled for removal.
What information is typically found in the title block of a construction or demolition blueprint?
Answer: Project name, drawing number, scale, date, and designer's seal
The title block contains key administrative information: project name, drawing number, revision dates, scale, and the engineer or architect's seal.
During selective demolition, blueprints call out 'INFILL' at a door opening. What does this mean for the demolition crew?
Answer: Demolish the infill already present in the opening
When blueprints label an opening 'INFILL,' it means a previously blocked or filled opening is to be demolished and opened back up.
A specification section's 'Quality Assurance' article typically requires the demolition contractor to do which of the following?
Answer: Submit qualifications, certifications, and sometimes a pre-demolition survey
Quality assurance requirements typically mandate proof of contractor qualifications, certifications, and a pre-demolition survey to document existing conditions.
On a plumbing or mechanical demolition drawing, what does the note 'CAP AND ABANDON' mean?
Answer: Seal the pipe end at the nearest accessible point and leave it in place
'Cap and Abandon' means the pipe is sealed at a specified point and left in place rather than fully removed, reducing demolition scope.
Which drawing type in a full set of construction documents would show the demolition contractor the location of existing underground utilities?
Answer: Civil or site utility plan
Civil or site utility plans depict the layout of underground systems like water, sewer, gas, and electrical conduit on or near the site.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- demolitionassociation.com — Test delivery, test dates, score validity, fees, exam format, passing score, retake fee, retake policy, score release · verified Oct 2026