← All CDCP Flashcard Decks

Capacity Planning and Power Budgeting Flashcards

7 cards from real CDCP practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Capacity Planning and Power Budgeting flashcards as text
  1. Current IT load is 400 kW, usable capacity is 700 kW and load grows 15% per year. About how many years until capacity runs out?

    Answer: About 4 years

    Solving 400 x 1.15^n = 700 gives n = ln(1.75)/ln(1.15), which is about 4 years.

  2. If the load on a UPS battery string doubles, what typically happens to the available runtime?

    Answer: It drops to less than half

    Because of Peukert-type effects, battery runtime falls more than proportionally as the discharge rate rises.

  3. Servers with dual power supplies are fed from separate A and B circuits. To survive the loss of one feed, each circuit should normally be loaded to no more than about what share of its breaker rating?

    Answer: 40%

    Each feed must be able to take the full load (80% max) if its partner fails, so normal loading per feed is about half of that, or 40%.

  4. A load draws 100 kVA at a power factor of 0.8. What is its real power?

    Answer: 80 kW

    Real power = apparent power x PF = 100 x 0.8 = 80 kW.

  5. A planned blade deployment would exceed the rack's design power density. What is the most appropriate planning response?

    Answer: Spread the load across more racks or add close-coupled cooling and containment

    Power and cooling must be matched, so either spread the load out or add targeted cooling capacity for the high-density zone.

  6. A room has a 300 kW heat load and four CRAH units rated at 100 kW each. What cooling redundancy does this give?

    Answer: N+1

    Three units (N) meet the 300 kW load, and the fourth provides N+1.

  7. When calculating PUE, which of the following is NOT counted as IT equipment load?

    Answer: CRAH fan power

    Cooling fans are facility infrastructure overhead, so they count in total facility power but not in IT load.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. epi-ap.com — Eligibility, exam format, passing score, score validity, retake policy, renewal, test delivery, exam information · verified Oct 2026
  2. exin.com — Time limit · verified Oct 2026