  1. How long can a typical data center UPS battery system be expected to carry the critical load?

    Answer: Long enough for the standby generator to start and take the load

    UPS batteries are usually sized for minutes of runtime to bridge the gap until generators start and take over.

  2. To support continuity during a long utility outage, what should a data center have for its generators?

    Answer: Onsite fuel storage plus priority refueling contracts with more than one supplier

    Enough onsite fuel plus guaranteed refueling contracts with several suppliers keeps generators running through long outages.

  3. Which concept describes a component whose failure alone would stop the whole system?

    Answer: Single point of failure

    A single point of failure is any one component that can bring down the system, and BC planning aims to remove these.

  4. Which redundancy configuration provides two fully independent distribution paths, each able to carry the full load?

    Answer: 2N

    2N provides a fully duplicated, independent system so either path can carry the full load alone.

  5. When choosing a geographic location for a DR site, what is the key consideration?

    Answer: It should be far enough away not to share the same regional risks

    A DR site should be far enough away that one regional event, such as a hurricane, earthquake or grid failure, cannot hit both sites.

  6. What is Work Recovery Time (WRT)?

    Answer: Time after systems are restored to verify data and resume normal operations

    WRT is the time needed after technical recovery to check data integrity and bring business processes back to normal.

  7. Which statement correctly describes the relationship between RTO, WRT and MTPD?

    Answer: RTO + WRT should not exceed MTPD

    Total downtime, made up of system recovery (RTO) plus work recovery (WRT), must stay within the MTPD.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. epi-ap.com — Eligibility, exam format, passing score, score validity, retake policy, renewal, test delivery, exam information · verified Oct 2026
  2. exin.com — Time limit · verified Oct 2026