Which metric defines the maximum acceptable amount of data loss measured in time after a disruption?
Answer: Recovery Point Objective (RPO)
RPO is the point in time to which data must be recovered, so it sets the maximum tolerable data loss.
A data center replicates every transaction to a secondary site and waits for acknowledgment before committing. What is the main trade-off of this approach?
Answer: Near-zero RPO but added latency and distance limits
Synchronous replication gives near-zero data loss but adds write latency, which limits how far apart the sites can be.
Which recovery site type has power, cooling and network connectivity in place but no installed IT equipment?
Answer: Cold site
A cold site provides basic facility infrastructure only, so equipment must be delivered and configured after a disaster.
What is the main purpose of a Business Impact Analysis (BIA)?
Answer: To identify critical processes and the impact of their disruption over time
A BIA identifies critical business functions, their dependencies and the operational and financial impact of losing them over time.
Which international standard specifies requirements for a Business Continuity Management System (BCMS)?
Answer: ISO 22301
ISO 22301 is the certifiable standard for business continuity management systems.
During a regional disaster, staff cannot reach the primary site. Which BC plan element most directly addresses this risk?
Answer: Alternate work locations and remote access arrangements
Plans must include alternate work locations and remote access so key personnel can keep working when the site cannot be reached.
How should the relationship between RTO and MTPD be set?
Answer: RTO must be equal to or shorter than MTPD
Recovery must finish before the business reaches its maximum tolerable disruption, so RTO must not exceed MTPD.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- epi-ap.com — Eligibility, exam format, passing score, score validity, retake policy, renewal, test delivery, exam information · verified Oct 2026
- exin.com — Time limit · verified Oct 2026