What does Recovery Time Objective (RTO) define in a data center disaster recovery plan?
-
A
The maximum acceptable duration to restore normal operations after a disruption
-
B
The maximum acceptable amount of data that can be lost after a failure
-
C
The minimum time required between scheduled maintenance windows
-
D
The total time needed to complete a full data backup cycle