Risk Management & Mitigation Flashcards

7 cards from real CD practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Risk Management & Mitigation flashcards as text
  1. A drafter working on a renovation project finds that field measurements disagree with the archived as-built drawings. What is the best risk-mitigating response?

    Answer: Treat verified field measurements as governing, flag the discrepancy, and update the base drawings with a documented note

    Verified existing conditions govern renovation work, and documenting the discrepancy protects against downstream errors.

  2. Which access control practice best reduces the risk of unauthorized changes to released drawing files?

    Answer: Setting released files to read-only or moving them to a locked archive folder with restricted write permissions

    Read-only or permission-locked archives prevent silent post-release edits to the official record.

  3. A drafting manager performs a lessons-learned review after a project with major coordination errors. In the risk management cycle, this activity supports which step?

    Answer: Monitoring and continuous improvement, feeding future risk identification

    Lessons-learned reviews close the risk cycle by turning past failures into improved future risk identification and controls.

  4. Interference (clash) detection software is run on a coordinated BIM model before drawings are issued. This primarily mitigates which risk?

    Answer: Costly field conflicts between building systems, such as ducts routed through structural members

    Clash detection finds spatial conflicts digitally, where fixes cost far less than during construction.

  5. A drafter is asked to sign and seal drawings prepared entirely by someone else whose work they did not supervise or review. Why is this a major professional risk?

    Answer: It may constitute negligent misrepresentation and violate licensing rules on responsible charge

    Sealing work not performed under one's responsible charge exposes the professional to disciplinary action and liability.

  6. Which scenario is an example of accepting a risk rather than mitigating it?

    Answer: Deciding to proceed with a minor formatting inconsistency on legacy sheets because fixing it costs more than any likely consequence

    Risk acceptance means knowingly proceeding without further action because the exposure is tolerable relative to the cost of controls.

  7. When archiving completed project drawings for long-term liability protection, which factor is most important?

    Answer: Retaining complete, dated record sets in a durable and retrievable format for at least the statute of repose period

    Complete dated archives retained through the statute of repose are the firm's primary defense in future claims.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. adda.org — Fees, score validity, test delivery, eligibility, passing score · verified Oct 2026